Part definitions

Tenn. Code Ann. § 68-126-402, under Tennessee Manufactured Home Installation Act.

Tenn. Code Ann. § 68-126-402

(1) As used in this part, unless the context otherwise requires:(1) “Commissioner” means the commissioner of commerce and insurance or the commissioner's designee;(2) “Installer” means a licensed manufactured home installer, or a licensed manufactured home retailer. It does not include individual employees of licensed installers and retailers, unless such individuals are duly licensed as installers or retailers in accordance with this chapter;(3) “Manufactured home” is defined as in § 68-126-202;(4) “Person” means any individual, firm, association, corporation, or legal entity; and(5) “Set-up” means an installation of the manufactured home according to the manufacturer's installation instructions or those provided in § 68-126-403(c)(2)-(4), and includes, but is not limited to, site preparation; support structures, including footings, piers, caps and shims; anchoring systems; connection, fastening, moisture barrier installation between sections, and roofing dry-in of multi-sections; HVAC duct connections; plumbing and electrical cross-over connections; completion of exterior siding; installation of heating application ventilation systems or fireplace chimney systems; and completion of hinged roof sections.

(1) “Commissioner” means the commissioner of commerce and insurance or the commissioner's designee;

(2) “Installer” means a licensed manufactured home installer, or a licensed manufactured home retailer. It does not include individual employees of licensed installers and retailers, unless such individuals are duly licensed as installers or retailers in accordance with this chapter;

(3) “Manufactured home” is defined as in § 68-126-202;

(4) “Person” means any individual, firm, association, corporation, or legal entity; and

(5) “Set-up” means an installation of the manufactured home according to the manufacturer's installation instructions or those provided in § 68-126-403(c)(2)-(4), and includes, but is not limited to, site preparation; support structures, including footings, piers, caps and shims; anchoring systems; connection, fastening, moisture barrier installation between sections, and roofing dry-in of multi-sections; HVAC duct connections; plumbing and electrical cross-over connections; completion of exterior siding; installation of heating application ventilation systems or fireplace chimney systems; and completion of hinged roof sections.