45,791 sections across 577 Texas regulatory chapters.
R.12 16 TAC §12.538 — COAL MINE WASTE BANKS: CONSTRUCTION REQUIREMENTS
2.6K chars
(a) Coal mine waste banks shall be constructed in compliance with § 12.531 and § 12.532 of this title (relating to Disposal of Underground Development Waste and Excess Spoil: General Requirements, and to Disposal of Underground Development Waste and Excess Spoil: Valley Fills), e…
R.12 16 TAC §12.539 — COAL MINE WASTE: BURNING
0.6K chars
Coal mine waste fires shall be extinguished by the person who conducts the underground mining activities in accordance with a plan approved by the Commission and the Mine Safety and Health Administration. The plan shall contain, at a minimum, provisions to ensure that only those …
R.12 16 TAC §12.540 — COAL MINE WASTE: BURNED-WASTE UTILIZATION
1.0K chars
Before any burned coal mine waste or other materials or refuse is removed from a disposal area, approval shall be obtained from the Commission. A plan for the method of removal, with maps and appropriate drawings to illustrate the proposed sequence of the operation and methods of…