73-3b-102. Definitions.
As used in this chapter:
(1) "Artificially recharge" means to place water in an aquifer: by means of: injection; surface infiltration; or another method; and for the purposes of: storing the water; and recovering the water.
(2) "Division" means Division of Water Rights.
(3) "Recharge permit" means a permit issued by the state engineer to construct and operate a recharge project.
(4) "Recharge project" means to artificially recharge water into an aquifer.
(5) "Recovery permit" means a permit issued by the state engineer to construct and operate a recovery project.
(6) "Recovery project" means to withdraw from an aquifer water that has been artificially recharged pursuant to a recharge permit.