73-3b-204. Application for a recovery permit -- Required information.
(1) A person may file a recovery permit application with a recharge permit application.
(2) The application for obtaining a recovery permit shall include the following information: the name and mailing address of the applicant; a legal description of the location of the existing well or proposed new well from which the applicant intends to recover artificially recharged water; a written consent from the owner of the recharge permit, if the applicant does not hold the recharge permit; the name and mailing address of the owner of the land from which the applicant proposes to recover artificially recharged water; the name or description of the artificially recharged groundwater aquifer which is the source of supply; the purpose for which the artificially recharged water will be recovered; the depth and diameter of the existing well or proposed new well; a legal description of the area where the artificially recharged water is proposed to be used; the design pumping capacity of the existing well or proposed new well; and any other information including maps, drawings, and data that the state engineer requires.
(3) A filing fee must be submitted with the application. The state engineer shall establish the filing fee in accordance with Section. 63J-1-504