8 chapters · 189 sections in this title.
Utah Code § 34A-7-101 Scope of chapter -- Exemptions.
0.8K chars
34A-7-101. Scope of chapter -- Exemptions. (1) Except as provided in Subsection (2), this part applies to any boiler or pressure vessel used in: (a) industrial or manufacturing establishments; (b) business establishments; (c) sawmills; (d) construction jobs; and (e) any place whe…
Utah Code § 34A-7-102 Standards for construction and design -- Special approved designs -- Maintenance requirements.
0.9K chars
34A-7-102. Standards for construction and design -- Special approved designs -- Maintenance requirements. (1) For the purposes of this part, the standards for the design and construction of a new boiler and new pressure vessel shall be the latest applicable provisions of the Boil…
Utah Code § 34A-7-103 Inspection requirements -- Inspection certificate -- Standards of inspectors.
3.3K chars
34A-7-103. Inspection requirements -- Inspection certificate -- Standards of inspectors. (1) On and after July 1, 1967, each boiler used or proposed to be used within this state, except boilers exempt under Section 34A-7-101, shall be thoroughly inspected: (a) internally and exte…
Fees.
0.2K chars
34A-7-104. Fees. The owner or user of a boiler required by this part to be inspected shall pay to the commission fees for inspection or for permits to operate in amounts set by the commission pursuant to Section 63J-1-504.