28 chapters · 396 sections in this title.
Utah Code § 54-18-101 Title.
0.1K chars
54-18-101. Title. This chapter is known as the "Siting of High Voltage Power Line Act."
Utah Code § 54-18-102 Definitions.
2.1K chars
54-18-102. Definitions. As used in this chapter: (1) "Affected entity" means the same as that term is defined in Sections 10-20-102 and 17-79-102. (2) "Affected landowner" means an owner of a property interest, as reflected in the most recent county or city tax records as receivi…
Utah Code § 54-18-201 Public utility to obtain approval for high voltage power lines.
0.8K chars
54-18-201. Public utility to obtain approval for high voltage power lines. (1) Except as provided in Subsections (2) and (3), a public utility shall comply with the requirements of this chapter before beginning construction or operation of: (a) a high voltage power line; or (b) a…
Utah Code § 54-18-301 Notice of intent to file -- Content -- Prefiling procedures.
4.0K chars
54-18-301. Notice of intent to file -- Content -- Prefiling procedures. (1) If a public utility conducts any field work in preparation of establishing a target study area before a notice of intent is filed in accordance with Subsection (2)(a), the public utility shall first notif…