38 chapters · 526 sections in this title.
Utah Code § 73-3b-107 Recoverable water -- State engineer to determine.
0.3K chars
73-3b-107. Recoverable water -- State engineer to determine. A person who holds a recovery permit may recover the amount of water stored by the recharge project which the state engineer determines has reached the aquifer and remains within the hydrologic area of influence.
Utah Code § 73-3b-201 Application for a recharge permit -- Required information -- Filing fee.
1.7K chars
73-3b-201. Application for a recharge permit -- Required information -- Filing fee. (1) The application for obtaining a recharge permit shall include the following information: the name and mailing address of the applicant; the name of the groundwater basin or groundwater sub-bas…
Utah Code § 73-3b-202 Issuance of recharge permit -- Criteria -- Conditions.
1.0K chars
73-3b-202. Issuance of recharge permit -- Criteria -- Conditions. The state engineer: (1) shall issue a recharge permit if: the applicant has: the technical and financial capability to construct and operate the recharge project; and a valid water right for the use of the water pr…
Utah Code § 73-3b-203 Proof of completion, certification, or lapse of recharge permit.
2.9K chars
73-3b-203. Proof of completion, certification, or lapse of recharge permit. (1) Sixty days before the date on which the recharge permit will lapse under Subsection, the state engineer shall notify the applicant by mail, or send notice electronically if receipt is verifiable, when…