28 chapters · 396 sections in this title.
Utah Code § 54-18-102 Definitions.
2.0K chars
54-18-102. Definitions. As used in this chapter: (1) "Affected entity" means the same as that term is defined in Sectionsand. 10-20-102 17-79-102 (2) "Affected landowner" means an owner of a property interest, as reflected in the most recent county or city tax records as receivin…
Utah Code § 54-18-201 Public utility to obtain approval for high voltage power lines.
0.8K chars
54-18-201. Public utility to obtain approval for high voltage power lines. (1) Except as provided in Subsectionsand, a public utility shall comply with the requirements of this chapter before beginning construction or operation of: (2) (3) a high voltage power line; or an upgrade…
Utah Code § 54-18-301 Notice of intent to file -- Content -- Prefiling procedures.
3.7K chars
54-18-301. Notice of intent to file -- Content -- Prefiling procedures. (1) If a public utility conducts any field work in preparation of establishing a target study area before a notice of intent is filed in accordance with Subsection, the public utility shall first notify the l…
Utah Code § 54-18-302 Public workshops.
0.6K chars
54-18-302. Public workshops. After a public utility files the notice of intent in accordance with Subsectionand before it files a land use application, the public utility shall: (1) conduct informal public workshops at locations along the proposed corridor to provide information …