367 sections in this chapter.
R.296-155-296-155-53406 Signals.
5.8K chars
(1) A qualified signal person that meets the requirements in WAC 296-155-53302 must be provided in each of the following situations:(a) The point of operation, meaning the load travel or the area near or at load placement, is not in full view of the crane/equipment operator. The …
R.296-155-296-155-53408 Power line safety.
29.4K chars
(1) Assembly, disassembly, or reconfiguration of a crane/equipment.(a) Before assembling, disassembling, or reconfiguring a crane/equipment, it must first be determined if any part of the crane/equipment, load line, or load (including rigging and lifting accessories) could get, i…
R.296-155-296-155-53409 Training.
4.5K chars
(1) The employer must provide training as follows:(a) Overhead power lines. Prior to the assembly, disassembly, reconfiguration, or operation of a crane/equipment in the vicinity of energized lines, the employer must ensure that each employee is trained in accordance with the app…
R.296-155-296-155-53410 Safety devices.
2.5K chars
(1) Safety devices. The following safety devices are required on all cranes/equipment, except tower cranes and self-erecting tower cranes, covered by this part, unless otherwise specified. For requirements relating to operational aids and safety devices for tower cranes, see WAC …
R.296-155-296-155-53412 Operational aids.
10.7K chars
(1) The devices listed in this section (listed operational aids) are required on all cranes/equipment, unless otherwise specified.(a) The requirements in subsection (5)(a), (b) and (c) of this section do not apply to articulating cranes.(b) The requirements in subsection (4)(c), …
R.296-155-296-155-53414 Cranes/equipment with a rated hoisting/lifting capacity of 2,000 pounds or less.
9.6K chars
For all cranes/equipment with a maximum manufacturer-rated hoisting/lifting capacity of 2,000 pounds or less:(1) This part and the following sections apply: WAC 296-155-52900 Scope; WAC 296-155-52902 Definitions; WAC 296-155-53302 Signal person qualifications; WAC 296-155-53306 R…
R.296-155-296-155-53416 Forklifts when lifting a suspended load.
4.8K chars
(1) Effective January 1, 2027, forklift operators must be certified or qualified depending on the configuration and usage utilized to lift a suspended load.(2) All machine and attachment manufacturer prohibitions/restrictions must be complied with.(3) Operators must be evaluated …
R.296-155-296-155-537 Mobile cranes.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-537, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-53700 Mobile cranes—General.
3.6K chars
(1) All mobile cranes/equipment (greater than 2,000 pounds capacity) in use must meet the applicable requirements for design, construction, testing, inspection, maintenance, and operation as prescribed in the ASME B30.5-2021, Safety Standard for Mobile and Locomotive Cranes. It i…
R.296-155-296-155-53715 Mobile cranes—Operations.
2.9K chars
(1) Where applicable, if the load hoist mechanism is not equipped with an automatic brake and the load must remain suspended for any considerable length of time, the operator must hold the drum from rotating in the lowering direction by activating a manually operated brake. The b…
R.296-155-296-155-538 Articulating boom cranes.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-538, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-53800 Articulating boom cranes—General.
1.3K chars
(1) All articulating boom cranes in use must meet the applicable requirements for design, inspection, construction, testing, maintenance and operation as prescribed in the ASME B30.22-2023, Safety Standard for Articulating Boom Cranes. It is not the intent of this rule to require…
R.296-155-296-155-53815 Articulating boom cranes—Operations.
1.8K chars
(1) The operator must not engage in any practice that diverts their attention while actually engaged in operating the crane.(2) Stabilizers/outriggers must be visible to the operator or to a signal person during extension or setting.(3) When the crane is equipped with stabilizers…
R.296-155-296-155-539 Tower cranes.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-539, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-53900 Tower cranes—General.
31.9K chars
(1) This section contains supplemental requirements for tower cranes; all sections of this part apply to tower cranes unless specified otherwise. In addition, the requirements in WAC 296-155-53402 apply unless otherwise specified.(2) Stop work authority.(a) All employees, includi…
R.296-155-296-155-53905 Tower cranes—Additional inspection criteria.
0.8K chars
(1) In addition to the requirements in WAC 296-155-53405, the following additional items must be included:(a) Tower (mast) bolts and other structural bolts (for loose or dislodged condition) from the base of the tower crane up or, if the crane is tied to or braced by the structur…
R.296-155-296-155-53911 Tower cranes—Permits.
12.8K chars
(1) Beginning January 1, 2026, prior to performing or allowing the performance of any work involving the operation, assembly, disassembly, or reconfiguration of a tower crane, the prime contractor must obtain a permit issued by the department. The prime contractor must possess a …
R.296-155-296-155-53915 Tower cranes—Operations.
4.1K chars
(1) The operator must not engage in any practice that diverts their attention while actually engaged in operating the crane.(2) The operator must do the following before leaving the crane unattended:(a) Set down the load, rigging gear, bucket, lifting magnet, or other devices.(b)…
R.296-155-296-155-541 Self-erecting tower cranes.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-541, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54100 Self-erecting tower cranes—General.
23.5K chars
(1) All self-erecting tower cranes in use must meet the applicable requirements for design, construction, installation, testing, maintenance, inspection, and operation as prescribed by the manufacturer. For modification requirements, see WAC 296-155-53400 (57) and (58).(2) In add…
R.296-155-296-155-54115 Self-erecting tower cranes—Operations.
3.9K chars
(1) The operator must not engage in any practice that diverts their attention while actually engaged in operating the crane.(2) Before leaving the crane unattended the operator must:(a) Set down the load, rigging gear, bucket, lifting magnet, or other devices;(b) Land any load su…
R.296-155-296-155-542 Overhead/bridge and gantry cranes.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-542, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54200 Overhead/bridge and gantry cranes—General.
4.3K chars
(1) Permanently installed overhead/bridge and gantry cranes which are located in a manufacturing facility or powerhouse must follow the requirements of WAC 296-24-235 (General safety and health standards), even when a construction activity is being performed. This requirement app…
R.296-155-296-155-54215 Overhead/bridge and gantry cranes—Operations.
2.4K chars
(1) The operator must not engage in any practice that diverts their attention while actually engaged in operating the crane.(2) The operator must do the following before leaving a cab-operated crane or a cab-operated carrier unattended:(a) Remove any attached load and raise the h…
R.296-155-296-155-543 Derricks.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-543, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54300 Derricks—General.
7.7K chars
(1) This section contains supplemental requirements for derricks, whether temporarily or permanently mounted. All sections of this part apply to derricks unless specified otherwise. A derrick is powered equipment consisting of a mast or equivalent member that is held at, or near,…
R.296-155-296-155-54305 Derricks—Construction.
6.0K chars
(1) Guy derricks.(a) The minimum number of guys must be six, with equal spacing, except where a qualified person or derrick manufacturer approves variations from these requirements and revises the rated capacity to compensate for such variations.(b) The employer must not use guy …
R.296-155-296-155-54320 Derricks—Operations.
2.7K chars
(1) The operator must not engage in any practice that diverts their attention while actually engaged in operating the derrick.(2) The operator must do the following before leaving the derrick unattended:(a) Set down any attached load.(b) Disengage clutches.(c) Put the handles of …
R.296-155-296-155-544 Additional requirements for other types of cranes/derricks.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-544, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54400 Floating cranes/equipment and land cranes/equipment on barges.
18.2K chars
(1) This section contains supplemental requirements for floating cranes/equipment and land cranes/equipment on barges, pontoons, vessels, or other means of flotation (i.e., vessel/flotation device). The sections of this part apply to floating cranes/equipment and land cranes/equi…
R.296-155-296-155-54405 Dedicated pile drivers.
0.7K chars
(1) The provisions of chapter 296-155 WAC, Part L, apply to dedicated pile drivers, except as specified in this section.(2) WAC 296-155-53412 (4)(c) (Anti two-blocking device) does not apply.(3) WAC 296-155-53412 (5)(d) (Load weighing and similar devices) applies only to dedicate…
R.296-155-296-155-54410 Sideboom cranes.
1.1K chars
(1) The provisions of this standard apply, except WAC 296-155-53400(34) (Ground conditions), WAC 296-155-53410 (Safety devices), WAC 296-155-53412 (Operational aids), WAC 296-155-531 through 296-155-53214 (crane certifier accreditation and crane certification) and WAC 296-155-533…
R.296-155-296-155-547 Personnel lifting platforms (attached and suspended).
1.9K chars
(1) This rule applies to the lifting, lowering, and transporting of personnel using personnel platforms connected to cranes or derricks that are designed under ASME B30 series. Personnel platforms can be suspended from the crane or derrick by wire rope, or attached to the boom of…
R.296-155-296-155-548 Design and installation requirements for personnel lifting systems.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-548, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54800 Design of platforms and suspension systems.
9.0K chars
(1) Employers that manufacture personnel platforms or their suspension systems must be designed, constructed and tested according to ASME B30.23-2022, Personnel Lifting Systems. The design and manufacturer's specifications must be made by a RPE. Personnel platforms manufactured p…
R.296-155-296-155-549 Personnel lifting hoisting equipment.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-549, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-54900 Crane/equipment requirements for personnel lifting.
4.6K chars
(1) Crane/equipment must meet the requirements in this part and the applicable crane/equipment ASME B30 volume in addition to the following requirements in this section.(2) The employer must not use the following cranes/equipment to lift personnel:(a) Articulating boom cranes, un…
R.296-155-296-155-551 Inspections, maintenance and testing.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-551, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-55100 Inspections on cranes and personnel platforms.
1.8K chars
(1) A qualified person must inspect personnel platforms before use and at each new job site to make sure the requirements of WAC 296-155-548 through 296-155-55305 are met.(2) A qualified person must inspect all items in Table 9 at least once each shift, before use.(3) The employe…
R.296-155-296-155-55105 Adjustments and repairs on personnel platforms.
1.1K chars
(1) Any adjustments or repairs to the platform must be done by a qualified person.(2) Adjustments or repairs to the suspension system must be done by a qualified person.(3) Replacement parts and repairs must be equal to or exceed the original equipment specifications.(4) The manu…
R.296-155-296-155-55110 Proof load test platforms and rigging.
2.8K chars
(1) The employer must proof load test the platform and rigging at each new location before lifting personnel. This may be done at the same time as the trial lift.(a) Proof load test as follows:(i) Test to 125% of the platform's rated capacity.(ii) The platform must be lowered by …
R.296-155-296-155-55115 Trial lift.
3.8K chars
(1) The employer must perform a trial lift with the personnel platform, on each shift before lifting personnel, to check the following:(a) Crane/equipment setup and configuration is correct;(b) Load capacities are adequate;(c) No hazardous interferences exist;(d) The operator's o…
R.296-155-296-155-552 Employer responsibilities.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-552, filed 12/20/11, effective 2/1/12.]
R.296-155-296-155-55200 Employer responsibilities for lifting personnel.
3.5K chars
(1) The employer must require that the provisions of this part are understood and applied at the operational levels and that the appropriate portions of this part are included in the prelift briefing information.(2) The employer must:(a) Assign an employee to function as the lift…
R.296-155-296-155-55205 Responsibilities of the personnel lift supervisor.
3.3K chars
(1) The personnel lift supervisor must:(a) Supervise the personnel lift operation;(b) Verify all crane/equipment and platform inspections have been accomplished as outlined in this part;(c) Inspect the area for potential hazards, any hazards found during this inspection must be r…
R.296-155-296-155-55210 Crane/equipment operation requirements for personnel lifting.
4.3K chars
(1) Before lifting personnel the following must be met:(a) Operate crane/equipment with outriggers or stabilizers extended, blocked, and locked in accordance with the manufacturers' specifications;(b) For crane/equipment that uses wire rope to hoist a personnel platform, verify t…
R.296-155-296-155-553 Lifting personnel.
0.6K chars
The employer must only lift personnel on platforms with cranes or derricks if it is the only possible way to accomplish the work that needs to be done. See WAC 296-155-547.[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 25-16-089, …
R.296-155-296-155-55300 Personnel lifting requirements.
9.4K chars
(1) Conditions must provide clear visibility. When conditions such as darkness, fog, or snow prevent clear visibility, a personnel lift must not be performed.(2) Personnel platforms shall not be used in winds (sustained or gusts) in excess of 20 mph (32.2 km/hr), or in electric s…
R.296-155-296-155-55305 Lifting personnel near electrical power lines.
5.9K chars
(1) It is recognized that lifting personnel where the crane/equipment or platform can become electrified from electric power lines is an extremely hazardous practice. It is required to perform the lift so there is no possibility of the crane/equipment, load line, or personnel pla…
R.296-155-296-155-554 Boatswain's chairs.
0.2K chars
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.440, 49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-554, filed 12/20/11, effective 2/1/12.]