R.296-155-296-155-53406 Signals.
5.8K chars
(1) A qualified signal person that meets the requirements in WAC 296-155-53302 must be provided in each of the following situations:(a) The point of operation, meaning the load travel or the area near or at load placement, is not in full view of the crane/equipment operator. The …
R.296-155-296-155-53408 Power line safety.
29.4K chars
(1) Assembly, disassembly, or reconfiguration of a crane/equipment.(a) Before assembling, disassembling, or reconfiguring a crane/equipment, it must first be determined if any part of the crane/equipment, load line, or load (including rigging and lifting accessories) could get, i…
R.296-155-296-155-53409 Training.
4.5K chars
(1) The employer must provide training as follows:(a) Overhead power lines. Prior to the assembly, disassembly, reconfiguration, or operation of a crane/equipment in the vicinity of energized lines, the employer must ensure that each employee is trained in accordance with the app…