Caissons to be braced.

RCW 49.24.280 — under Chapter 49.24 Health and safety—Underground workers..

RCW 49.24.280

All caissons shall be properly and adequately braced before loading with concrete or other weight.[ 1941 c 194 s 21; Rem. Supp. 1941 s 7666-29.]