191.11 Revocation of certificate. If any railroad company
May 22, 2026, are designated by NOTES. (Published 5-22-26)
191.11
RAILROADS; CONSTRUCTION
after obtaining a certificate that public convenience and a necessity require the construction of the whole or part of its railroad fails to begin construction within one year from the date of the certificate, or having begun such construction, fails to prosecute the same, the office may inquire into the reasons for such failure and may revoke the certificate, if the office finds, after notice and hearing, that such failure is unreasonable. History: 1981 c. 347 s. 80 (1); 1993 a. 16, 123.
Updated 23-24 Wis. Stats.
2
that the applicant proposes to install, showing the kind, quality and weight of the rail proposed to be used, the mode of construction, character, quality, and strength of all bridges, culverts and viaducts, the abutments and approaches proposed to be built, the grade of and proposed method of draining the roadbed, and the kind of power to be used and the plant and appliances to be employed in power production, and such other facts relating to the construction of the proposed railroad as the office requires. History: 1981 c. 347 s. 80 (1); 1993 a. 16, 123.