83.04 Highway construction by county; noncontract work; payments. (1) All highway improvements made by the county highway committee shall be by contract, unless the committee determines that some other method would better serve the public interest. The manner of advertising for bids and the forms of bids, contracts and bonds shall be substantially those used by the department. In letting a contract the county highway committee acts for the county. (2) If it is deemed inadvisable to let a contract for highway construction, the county highway committee may direct the county highway commissioner to proceed with the construction as noncontract work, and the commissioner may, under the supervision of the committee, employ and purchase the necessary labor and materials. (3) During construction the work and materials shall be inspected by the county highway commissioner or by inspectors employed by the commissioner with the approval of the county highway committee. Upon the completion of any highway job by or for the county on the county aid system or for which county aid has been granted the work shall be inspected by the county highway commissioner, and if found in conformity with plans and specifications, the commissioner shall so find and notify the county highway committee and the county clerk thereof and that the improvement has been accepted. (4) Upon contract construction final payment shall not be made until the work has been accepted as complete by the county highway commissioner. In case of noncontract work payment shall be made monthly upon verified, detailed, statements and payrolls prepared by the county highway commissioner and approved and allowed by the county highway committee, and all payments shall be made by orders on the county treasurer in the ordinary form signed by the chairperson of the county board and
May 22, 2026, are designated by NOTES. (Published 5-22-26)
83.04
Updated 23-24 Wis. Stats.
COUNTY HIGHWAYS
the county clerk, unless the county has adopted some different method of making disbursements, in which event it shall be according to such method and all orders shall be drawn upon and paid out of the fund provided for such construction. Said statements and payrolls shall be filed with the county clerk. (5) When final payment has been made upon any highway improvement, any funds remaining in the county treasurer’s hands which were provided by any subdivision of the county for that particular improvement, shall be placed together with the county’s balance available for that job to the credit of such subdivision of the county, and shall be used to increase the funds available for the next construction job in said subdivision, and any such balance in the bridge fund may be transferred to the road fund or vice versa by the town or village board with the approval of the county highway committee. (6) No order shall be drawn on the county road or bridge fund in excess of the funds available for the particular improvement for which drawn, without the authority of the county board or the county highway committee. History: 1977 c. 29 s. 1654 (8) (c); 1983 a. 192 s. 303 (2); 1985 a. 223 s. 5; 1991 a. 316. Projects involving county highway contracts entered into by the county highway committee or the county highway commissioner under ss. 83.035 and 83.04 (1) are exempt from county competitive bidding requirements. OAG 5-09.
83.05 Improving streets over 18 feet wide. (1) When a portion of the system of county aid highways in any city is to be improved, and the funds from the city and county are available therefor, the city may determine that the roadways shall be paved to a greater width than 18 feet. If it so decides, the city may determine the type of improvement, the width, and all other features of the construction, subject to the approval of the county highway committee. And said committee shall fix the amount per linear foot of the improvement to be paid by the county. The city shall then improve the street in the manner provided generally for making street improvements. The work shall be done under the supervision of the city, but subject to the inspection of the county highway commissioner. (2) Upon the completion of the work the county’s share of the cost shall be paid to the contractor as though the county had been an immediate party to the contract. Unless specifically authorized by the county, the payment by the county shall not exceed the cost of 22 feet of the width of the pavement, as well as a portion of the costs of grading, draining, and appertaining structures. The balance of the expense of the improvement shall be borne by the city, and shall be provided in the manner in which expense of street improvement is ordinarily met. Assessments of benefits may be made by the city against abutting property in the manner provided where the improvement is done solely at the expense of the city, but such assessments of benefits shall not exceed the difference between the cost of the improvement and the amount contributed thereto by the county. (3) The provisions of subs. (1) and (2) shall apply to villages and towns subject to the approval of the county board. History: 1993 a. 246, 248.