18 chapters · 353 sections in this title.
W.S. § 37-16-101 Definitions
1.8K chars
Definitions. (a) As used in this chapter unless the context or a specific article otherwise requires: (i) "Commission" means public service commission of Wyoming; (ii) "Customer-generator" means a user of a net metering system; (iii) "Electrical company" means any person, corpora…
W.S. § 37-16-102 Electric utility requirements
0.7K chars
Electric utility requirements. (a) An electric utility: (i) Shall offer to make available to each of its eligible customer-generators that has installed a net metering system an energy meter that is capable of registering the flow of electricity in two (2) directions; (ii) May, a…
W.S. § 37-16-103 Calculation requirements
1.2K chars
Calculation requirements. (a) Consistent with other provisions of this chapter, the net energy measurement shall be calculated in the following manner: (i) The electric utility shall measure the net electricity produced or consumed during the billing period, in accordance with no…
W.S. § 37-16-104 Safety and performance requirements
1.3K chars
Safety and performance requirements. (a) A net metering system used by a customer-generator shall meet all applicable safety and performance standards established by the national electrical code, the institute of electrical and electronics engineers and underwriters laboratories.…