W.S. § 41-3-931 Application; when granted generally; denial subject to review; defects and corrections generally; cancellation
0.9K chars
Application; when granted generally; denial subject to review; defects and corrections generally; cancellation. An application for a permit for a well in any areas not designated as a critical area shall be granted as a matter of course, if the proposed use is beneficial and, if …
W.S. § 41-3-932 Public notice of application or petition; hearing before state engineer and control area advisory board; cost
5.8K chars
Public notice of application or petition; hearing before state engineer and control area advisory board; cost. (a) Upon the filing of a petition to amend an existing water right or an application to appropriate underground water for any use other than domestic, stockwatering or m…
W.S. § 41-3-933 Express conditions limiting rights of appropriator; additional conditions
0.5K chars
Express conditions limiting rights of appropriator; additional conditions. It is an express condition of each underground water permit that the right of the appropriator does not include the right to have the water level or artesian pressure at the appropriator's point of diversi…
W.S. § 41-3-934 Time limits to complete construction; extensions; cancellation generally
0.4K chars
Time limits to complete construction; extensions; cancellation generally. If the permit is granted, the applicant shall complete the construction and apply the water to beneficial use before the date specified in the conditions of approval, which shall not be more than three (3) …