Facility

Northvolt Ett -- Skellefteå, Västerbotten, Sweden

Operated by Northvolt ABSE · Skellefteå, Västerbotten County, Swedenmanufacturing_plant

Northvolt's primary factory in Skellefteå, northern Sweden; begun 2020, target 60 GWh capacity. Achieved ~1 GWh/yr actual production before bankruptcy filing (November 2024). Located for access to Swedish hydropower (low-carbon electricity) and proximity to Boliden's mining/smelting operations. Factory remains operational under bankruptcy protection as restructuring proceeds.

0

Inputs produced

0

Goods downstream

0

Incidents on record

0

Stories