Facility

Wolfspeed Mohawk Valley Fab (Marcy NY)

Operated by Wolfspeed Inc.US · New Yorkfab

Wolfspeed's Mohawk Valley Fab in Marcy NY (Utica metro); opened 2022; 200mm (8-inch) GaN-on-SiC wafer facility; largest GaN-on-SiC fab in the world by planned capacity. Built with ~$1B+ capex and partial US DoD subsidization; targeted at 5G base station PAs and military radar chips. 200mm GaN-on-SiC is a significant advance over standard 150mm — reduces per-wafer cost substantially. Mohawk Valley was planned to offset Wolfspeed's Durham NC (Cree legacy) facility limitations. Source: https://www.wolfspeed.com/company/mohawk-valley/

1

Inputs produced

1

Goods downstream

0

Incidents on record

0

Stories

What's produced here

1 input from this facility

Tap an input to see every good that depends on it, every country that produces it, and every other company in the supply chain.

Where it shows up

Goods that depend on this facility