§410eeee–14 Flow Management

Title 16 › CHAPTER 1 — NATIONAL PARKS, MILITARY PARKS, MONUMENTS, AND SEASHORES › SUBCHAPTER LIX–CCC — NEW RIVER GORGE NATIONAL PARK AND PRESERVE › § 410eeee–14

Last updated Sep 23, 2026|Official source

Summary

Require the Secretary of the Army, working with the Secretary of the Interior, to study whether changing the daily timing of releases from Bluestone Lake when outflow is less than 3,000 cubic feet per second could improve recreation in the New River Gorge National River and help protect river life. A draft report must be opened for public comment, and the final report must be sent to the Committee on Energy and Natural Resources of the United States Senate and the Committee on Interior and Insular Affairs of the United States House of Representatives by December 31, 1989. The final report must include comments from the Secretary of the Interior and the public plus the Army’s responses. Any suggested timing changes must fit other project goals and must not cause significant harm to fishing or other recreation at Bluestone Lake or downstream. The study must look at effects on recreation between Hinton and Thurmond and between Thurmond and the downstream boundary of the New River Gorge National River, taking visitor levels into account. The Army must also run test releases in the summer of 1989 during 24-hour periods when flows are under 3,000 cubic feet per second. Tests must move higher-than-average flows into morning and afternoon hours and collect data on current speed and water surface levels in the river segments. No test may be done when flows are below 1,700 cubic feet per second, and no test may lower flows below that level.

Full Legal Text

Title 16, §410eeee–14

Conservation, Source: USLM XML via OLRC

(a)Findings
The Congress finds that adjustments of flows from Bluestone Lake project during periods of low flow are necessary to respond to the congressional mandate contained in section 410eeee–9 of this title and that such adjustments could enhance the quality of the recreational experience in the segments of the river below the lake during those periods as well as protect the biological resources of the river.
(b)Report to Congress required
The Secretary of the Army, in conjunction with the Secretary of the Interior, shall conduct a study and prepare a report under this section. The report shall be submitted to the Committee on Energy and Natural Resources of the United States Senate and the Committee on Interior and Insular Affairs of the United States House of Representatives not later than December 31, 1989. Before submission of the report to these Committees, a draft of the report shall be made available for public comment. The final report shall include the comments submitted by the Secretary of the Interior and the public, together with the response of the Secretary of the Army to those comments.
(c)Contents of study
The study under this section shall examine the feasibility of adjusting the timing of daily releases from Bluestone Lake project during periods when flows from the lake are less than three thousand cubic feet per second. The purpose of such adjustment shall be to improve recreation (including, but not limited to, fishing and whitewater recreation) in the New River Gorge National River. Any such adjustments in the timing of flows which are proposed in such report shall be consistent with other project purposes and shall not have significant adverse effects on fishing or on any other form of recreation in Bluestone Lake or in any segment of the river below Bluestone Lake. The study shall assess the effects of such flow adjustments on the quality of recreation on the river in the segments of the river between Hinton and Thurmond and between Thurmond and the downstream boundary of the New River Gorge National River, taking into account the levels of recreational visitation in each of such segments.
(d)Test procedures
As part of the study under this section, the Secretary of the Army shall conduct test releases from Bluestone Lake project during twenty-four-hour periods during the summer of 1989 when flows are less than three thousand cubic feet per second from the project. All such adjustments shall conform to the criteria specified in subsection (c). The tests shall provide adjustments in the timing of daily flows from Bluestone Lake project which permit flows higher than the twenty-four-hour average to reach downstream recreational segments of the river during morning and afternoon hours. The tests shall develop specific data on the effects of flow adjustments on the speed of the current and on water surface levels in those segments. No test shall be conducted when flows from the lake are less than one thousand seven hundred cubic feet per second and no test shall reduce flows below that level.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

Codification Section was formerly classified to section 460m–28 of this title.

Statutory Notes and Related Subsidiaries

Change of Name

Committee on Interior and Insular Affairs of the House of Representatives changed to Committee on Natural Resources of the House of Representatives on Jan. 5, 1993, by House Resolution No. 5, One Hundred Third Congress. New River Gorge National River redesignated New River Gorge National Park and Preserve by Pub. L. 116–260, div. FF, title II, § 202, Dec. 27, 2020, 134 Stat. 3089, which is classified to section 410eeee of this title.

Reference

Citations & Metadata

Citation

16 U.S.C. § 410eeee–14

Title 16, Conservation

Last Updated

Sep 23, 2026

Release point: 119-110