Title 16, ConservationRelease 119-73not60

§460dd–7 Proposed Road Study

Title 16 › Chapter 1— NATIONAL PARKS, MILITARY PARKS, MONUMENTS, AND SEASHORES › Subchapter LXXXVIII— GLEN CANYON NATIONAL RECREATION AREA › § 460dd–7

Last updated Apr 5, 2026|Official source

Summary

The Secretary of the Interior and the Utah Highway Department must study road routes in and next to the recreation area and pick a specific scenic, low-speed road from Glen Canyon City to Bullfrog Basin. That road must cross the Escalante River south of where the river enters Lake Powell at the 3,700-foot level. The route should limit environmental harm. It may include turnouts, overlooks, and scenic views and does not have to meet ordinary secondary-road standards. It must not cross the Escalante River north of Stephens Arch. The study must include a timetable for engineering, planning, and construction that the Secretary should follow when possible. The Secretary may install and maintain signs and interpretive devices that meet highway safety rules. The study must also identify other roads needed to use the area fully and to connect all entrances and exits. The Secretary and the Utah Highway Department must send their findings, any recommended legislation, and the funds needed to Congress within two years of October 27, 1972.

Full Legal Text

Title 16, §460dd–7

Conservation, Source: USLM XML via OLRC

(a)The Secretary, together with the Highway Department of the State of Utah, shall conduct a study of proposed road alinements within and adjacent to the recreation area. Such study shall locate the specific route of a scenic, low-speed road, hereby authorized, from Glen Canyon City to Bullfrog Basin, crossing the Escalante River south of the point where the river has entered Lake Powell when the lake is at the three thousand seven hundred-foot level. In determining the route for this road, special care shall be taken to minimize any adverse environmental impact and said road is not required to meet ordinary secondary road standards as to grade, alinement, and curvature. Turnouts, overlooks, and scenic vistas may be included in the road plan. In no event shall said route cross the Escalante River north of Stephens Arch.
(b)The study shall include a reasonable timetable for the engineering, planning, and construction of the road authorized in subsection (a) and the Secretary of the Interior shall adhere to said timetable in every way feasible to him.
(c)The Secretary is authorized to construct and maintain markers and other interpretative devices consistent with highway safety standards.
(d)The study specified in subsection (a) hereof shall designate what additional roads are appropriate and necessary for full utilization of the area for the purposes of this subchapter and to connect with all roads of ingress to, and egress from the recreation area.
(e)The findings and conclusions of the Secretary and the Highway Department of the State of Utah, specified in subsection (a), shall be submitted to Congress within two years of October 27, 1972, and shall include recommendations for any further legislation necessary to implement the findings and conclusions. It shall specify the funds necessary for appropriation in order to meet the timetable fixed in subsection (b).

Reference

Citations & Metadata

Citation

16 U.S.C. § 460dd–7

Title 16, Conservation

Last Updated

Apr 5, 2026

Release point: 119-73not60