Title 30 › CHAPTER 27 — GEOTHERMAL ENERGY › SUBCHAPTER I — PROJECT LOANS › § 1512
Loans under section 1511(a) can cover at most 50 percent of a project's cost. If the loan is for using the reservoir mainly for space heating, cooling, or process heat for structures or facilities that are existing or under construction, it can cover up to 90 percent. In no case can a loan be more than $3,000,000.
Full Legal Text
Mineral Lands and Mining, Source: USLM XML via OLRC
Reference
Citation
30 U.S.C. § 1512
Title 30, Mineral Lands and Mining
Last Updated
Aug 21, 2026
Release point: 119-102