Title 33 › CHAPTER 36 — WATER RESOURCES DEVELOPMENT › SUBCHAPTER V — GENERAL PROVISIONS › § 2351b
The Secretary must make sure repairs or maintenance on a Federal jetty, pile dike, or breakwater are enough to keep the project doing what it was built to do. Work must protect any harbor or inland harbor tied to the project from projected changes in wave action or wave height, including changes from relative sea level change, over the useful life of the project. The Secretary must not call such repair or maintenance "major rehabilitation" if either: the Secretary finds that projected wave or sea level changes will reduce the structure’s ability to meet the project’s purpose and the work is needed to restore that ability; or regular, routine Federal maintenance was not carried out and, because of that lack of maintenance, the structure’s integrity is degraded or a pile dike has become disconnected.
Full Legal Text
Navigation and Navigable Waters, Source: USLM XML via OLRC
Legislative History
Reference
Citation
33 U.S.C. § 2351b
Title 33, Navigation and Navigable Waters
Last Updated
Sep 22, 2026
Release point: 119-110