Title 33 › CHAPTER 15 — FLOOD CONTROL › § 701b–4
Put all Army surveys and the duties the Chief of Engineers carries out under the Secretary of the Army into the care of the Army’s Engineer Corps and its head. The Secretary of the Army must direct them and the Chief of Engineers must supervise, unless Congress says otherwise. The powers given to the Federal Power Commission by the Flood Control Act of June 28, 1938, and by earlier laws stay fully in effect. No new preliminary exams, surveys, projects, or cost estimates may be made for works unless those works are already listed in this Act, a prior Act, or a joint resolution. After the required formal reports on any examination, survey, project, or work are filed, no extra reports or estimates may be made unless a law allows them.
Full Legal Text
Navigation and Navigable Waters, Source: USLM XML via OLRC
Legislative History
Reference
Citation
33 U.S.C. § 701b–4
Title 33, Navigation and Navigable Waters
Last Updated
Aug 21, 2026
Release point: 119-102