Title 33 › Chapter 15— FLOOD CONTROL › § 702j–1
Neither flood-control project for the Saint Francis River or the Yazoo River can start until the States or other qualified agencies promise they will handle certain local costs and give needed land. They must agree to pay for any highway changes and any damages caused by building reservoirs so the United States pays nothing for those items. They must also provide, free to the United States, the lands and easements needed to build levees and drainage ditches. The Chief of Engineers may pick where Yazoo headwater reservoirs go, may replace the seven detention reservoirs described in his report of February 12, 1935 with levees, floodways, or extra channels, and may change the Saint Francis plan to add a detention reservoir and have the United States buy the lands and flooded areas needed for it (except flooded highways), so long as the U.S. cost does not increase. The Chief of Engineers may also substitute a combined reservoir, floodway, and levee plan for the Yazoo project if the total cost does not exceed the current authorization in House Committee on Flood Control Document Numbered 1, Seventy-fourth Congress, first session. Any such modified Yazoo plan is subject to the same local cooperation promises above.
Full Legal Text
Navigation and Navigable Waters, Source: USLM XML via OLRC
Legislative History
Reference
Citation
33 U.S.C. § 702j–1
Title 33, Navigation and Navigable Waters
Last Updated
Apr 5, 2026
Release point: 119-73not60