Title 42 › CHAPTER 134 — ENERGY POLICY › SUBCHAPTER VI — COAL › Part C — Other Coal Provisions › § 13368
The Secretary of the Interior, with help from the Secretary of Energy, must run the rules for coalbed methane on lands the United States owns the surface of or reserved the underground minerals. Within 180 days after October 24, 1992, the Secretary had to list the Affected States where ownership disputes, blocked development, lack of state rules, and little existing development were problems. At first the Affected States were West Virginia, Pennsylvania, Kentucky, Ohio, Tennessee, Indiana, and Illinois (effective October 24, 1992). Colorado, Montana, New Mexico, Wyoming, Utah, Virginia, Washington, Mississippi, Louisiana, and Alabama were excluded. A State can be removed from the list if its Governor petitions, or the State legislature passes a law or resolution. A Governor must give the legislature 6 months’ notice in a session before petitioning. If an Affected State does not adopt a strong permitting and development program within 3 years, the Secretary (with Energy) must step in and make the needed regulations. The Secretary must protect mining plans and keep coal seams mineable while preventing waste and protecting owners’ rights. If the Secretary takes charge, they must set well spacing rules within 90 days. People who claim ownership can apply to make spacing units and the Secretary can order pooling after a hearing. Owners in a pooled unit can (1) sell or lease their interest at a rate the Secretary sets, (2) join as a participating owner and pay their share of costs and get production, or (3) be a nonparticipating owner who is carried until they have been paid 300 percent of their share of costs and then become participating. Pooling orders create an operator and require an escrow account; the Secretary must pay legally entitled parties from escrow within 30 days after a final legal decision. No well may be drilled in an Affected State without the Secretary’s approval. To stimulate (fracture) a coal seam, the coal miner’s written consent is needed if within distances the Secretary sets; if consent is refused, the Secretary can decide after reviewing an affidavit and safety input. Notified coal operators have 30 days to object to drilling; the Secretary may deny drilling for safety or interference reasons or require changes like moving the well or a moratorium of up to two years. Wells drilled after October 24, 1992 that go through coal with reserves must allow safe future mining, plugging costs follow State law or contracts, venting for mine safety is allowed, and the Secretary must follow coal mine safety laws. A coal seam is generally any coal layer 20 inches or thicker unless thinner layers are being or can be commercially mined.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 13368
Title 42, The Public Health and Welfare
Last Updated
Sep 23, 2026
Release point: 119-110