Title 42 › CHAPTER 162 — ENERGY INFRASTRUCTURE › SUBCHAPTER I — GRID INFRASTRUCTURE AND RESILIENCY › Part A — Grid Infrastructure Resilience and Reliability › § 18713
Creates a program to help build large electric transmission lines and related facilities by offering contracts, loans, or public‑private partnerships. It sets up the Transmission Facilitation Program and a Treasury account called the Transmission Facilitation Fund to pay for the work. The Fund can include payments, loan repayments, contributions, amounts borrowed, and any appropriations. The Treasury may loan up to $2,500,000,000 in outstanding repayable balances, and up to $10,000,000 is authorized each year for fiscal years 2022 through 2026 for program costs. Key terms: Capacity contract — a contract giving the Secretary rights to use transmission capacity; Eligible electric power transmission line — a line able to carry at least 1,000 megawatts, or 500 megawatts if built or upgraded in an existing corridor; Eligible entity — someone who wants to build a project; Eligible project — building or upgrading qualifying lines or connecting an isolated microgrid in Alaska, Hawaii, or a U.S. territory; Related facility — facilities tied to a project, but not power plants or local distribution lines. Eligible entities must apply under rules the Secretary sets. How the help works: the Secretary can sign capacity contracts, make loans, or join a project’s design, construction, operation, maintenance, or ownership. Costs are usually recovered from the entities that benefit or through rates for the contracted capacity. Remaining balances may be forgiven at the end of a project’s useful life or for costs of studied projects that are never built. Capacity contracts must reflect fair market value, run no more than 40 years, and cover no more than 50% of a project’s capacity. The Secretary can market or transfer capacity by competitive process and must recover remaining costs when selling or relinquishing rights. Loan interest is set by the Secretary using comparable U.S. market yields. Before helping, the Secretary must certify the project is in the public interest, unlikely to be built on time without help, and likely to produce enough proceeds to cover contract or loan costs. The Secretary may allow other parties to join financing, is not required to operate or maintain projects, treats each project separately for cost recovery, and must prioritize projects that use capacity‑enhancing technology, improve reliability and resilience, support interregional transfer for growth, or help lower electricity sector greenhouse gas emissions.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 18713
Title 42, The Public Health and Welfare
Last Updated
Sep 22, 2026
Release point: 119-110