Title 42 › Chapter 19B— WATER RESOURCES PLANNING › Subchapter IV— MISCELLANEOUS PROVISIONS › § 1962d–5g
The Secretary of the Army must study the best ways to use hydroelectric power at Army-run water projects and write a plan based on the study. The study must look at things like how much hydro power is physically possible (and the economic, social, environmental, and institutional issues), regional needs for power, how hydro fits with other power sources, steps to make hydro help meet national demand, the timing of development, different types of hydro potential (high and low head, run-of-river, pumped storage), whether changing storage or operations could increase power at existing Corps projects, and any other relevant factors. Within three years after the first money is provided for the work, the Secretary must send the plan, supporting studies, and recommendations to the Senate Committee on Environment and Public Works and the House Committee on Public Works and Transportation. Up to $7,000,000 may be appropriated for the study and report. The Secretary may also do feasibility studies of specific Corps projects that the study finds to have high power potential, and up to $5,000,000 per fiscal year is authorized for each of fiscal years 1978 and 1979 for those studies.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 1962d–5g
Title 42, The Public Health and Welfare
Last Updated
Apr 5, 2026
Release point: 119-73not60