Title 42 › CHAPTER 70 — MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS › § 5404
Manufacturers must give each manufactured home a set of installation plans and instructions that a design-approval inspection agency has approved. Once federal model installation rules exist, those agencies cannot approve plans unless the plans are as protective as the model rules. A consensus committee has 18 months after it is fully formed to write proposed model installation rules that match approved home designs and manufacturers’ instructions and that consider the factors in section 5403(e). The Secretary then has 12 months to adopt final model rules after getting the proposal, also considering those factors, and must publish them after notice and a chance for public comment under section 553 of title 5. For five years starting December 27, 2000, no State or manufacturer may put in place standards that the Secretary finds are less protective than the rules in effect that day. After that five-year period, the Secretary must create an installation program and run it in any State whose laws do not meet the program’s requirements. Any approved installation program must use standards that are at least as protective as the Secretary’s model rules (or manufacturers’ instructions if those are equally protective), require installer training and licensing, and include inspections. The Secretary may hire a government agent to help run the program, but not a private contractor that has other contracts under this chapter.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 5404
Title 42, The Public Health and Welfare
Last Updated
Sep 22, 2026
Release point: 119-110