Title 42, The Public Health and WelfareRelease 119-102

§8454 Study of Compliance Problem of Small Electric Utility Systems

Title 42 › CHAPTER 92 — POWERPLANT AND INDUSTRIAL FUEL USE › SUBCHAPTER VII — ADMINISTRATION AND ENFORCEMENT › Part E — Studies › § 8454

Last updated Aug 21, 2026|Official source

Full Legal Text

Title 42, §8454

The Public Health and Welfare, Source: USLM XML via OLRC

(a)The Secretary shall conduct a study of the problems of compliance with this chapter experienced by those electric utility systems which have a total system generating capacity of less than 2,000 megawatts. The Secretary shall report his findings and his recommendations to the Congress not later than 2 years after the effective date of this chapter.
(b)There is authorized to be appropriated to the Secretary for the fiscal year 1979 not to exceed $500,000 to carry out the provisions of this section.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

References in Text

This chapter, referred to in subsec. (a), was in the original “this Act”, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chapter. For complete classification of this Act to the Code, see

Short Title

note set out under section 8301 of this title and Tables. The

Effective Date

of this chapter, referred to in subsec. (a), is the

Effective Date

of Pub. L. 95–620. See section 901 of Pub. L. 95–620, set out as an

Effective Date

note under section 8301 of this title.

Reference

Citations & Metadata

Citation

42 U.S.C. § 8454

Title 42, The Public Health and Welfare

Last Updated

Aug 21, 2026

Release point: 119-102