Title 42 › CHAPTER 100 — WIND ENERGY SYSTEMS › § 9210
The Secretary must start and run a federal study, working with other federal agencies, to find where wind energy systems could be used at federal sites. The study must find sites where wind is cost-competitive with the marginal costs of new conventional energy sources in the area. It must identify possible sites at the Department of Defense; Department of Transportation (including the U.S. Coast Guard, FAA, and Federal Highway Administration); Department of Commerce; Department of Agriculture; Department of the Interior; and others as needed. The study must also look at how wide use of wind would affect the electrical grid at different market levels, test wind system performance in uses like homes, farming, irrigation, industry, and remote utilities, and consult with agencies, industry, and scientists. A preliminary report to Congress is due within nine months after September 8, 1980; a detailed site plan within twelve months after September 8, 1980; recommendations on any needed incentives to the Senate Committee on Energy and Natural Resources and the House Committee on Science and Technology within eighteen months after September 8, 1980; and a performance report to Congress within two years after September 8, 1980. The Secretary may combine this work with other ongoing federal studies to avoid duplication.
Full Legal Text
The Public Health and Welfare, Source: USLM XML via OLRC
Legislative History
Reference
Citation
42 U.S.C. § 9210
Title 42, The Public Health and Welfare
Last Updated
Sep 22, 2026
Release point: 119-110