Title 43 › CHAPTER 22 — RIGHTS-OF-WAY AND OTHER EASEMENTS IN PUBLIC LANDS › § 967
Any U.S. citizen, company, or corporation wanting the benefits of sections 966–970 must file a map of its pipeline with the land-office officer the Secretary of the Interior designates. The map must be filed within 12 months after locating ten miles on surveyed land or within 12 months after the U.S. surveys unsurveyed land. If the Secretary approves, the map is recorded and the land crossed by the pipeline is thereafter disposed of subject to that right of way.
Full Legal Text
Public Lands, Source: USLM XML via OLRC
Legislative History
Reference
Citation
43 U.S.C. § 967
Title 43, Public Lands
Last Updated
Aug 21, 2026
Release point: 119-102