Title 7 › CHAPTER 107 — RENEWABLE ENERGY RESEARCH AND DEVELOPMENT › § 8107a
The program lets the Secretary of Agriculture give interest-free loans to eligible rural utilities and electric co-ops so those utilities can make loans to their customers to pay for energy-saving improvements. Eligible utilities are public power districts, similar public utilities, electric cooperatives that dealt with the Rural Utilities Service, or other RUS-eligible borrowers. Energy efficiency measures mean building improvements and cost-effective technologies (including some renewables and storage). A qualified consumer is a customer of an eligible utility who can repay a loan. The Secretary must set up a plan for measuring results and for training within 90 days after February 7, 2014, and may hire contractors to help. Utilities that had an energy-efficiency program in place before 60 days after February 7, 2014, may use their existing plans if approved. The program can keep making loans until the money runs out, and $75,000,000 is authorized for each fiscal year 2014 through 2023. Loans to utilities can run up to 20 years, annual advances can be no more than 50% of the approved loan, and special start-up advances up to 4% of the loan are allowed (repaid within 10 years or deferred to the end of that period). The loans to utilities earn no interest and do not count in calculating certain Rural Electrification Act loan ratios. The Secretary must publish yearly totals of applications, loans made, and loan recipients within 120 days after each fiscal year ends. Utilities use the funds to make loans to customers who can repay. Consumer loans may charge up to 5% interest to build a loan-loss reserve and cover program costs. Loans must pay for measures that cut energy use or costs enough so a 10-year loan is not an undue burden. Money cannot buy movable personal items unless they become permanently attached to the property. Loan payments are normally added to the customer’s regular service bill, but owners can prepay and utilities may use other safe repayment methods or require different repayment if the customer stops service. An energy audit by the utility is required before work is done, and utilities may act as general contractors.
Full Legal Text
Agriculture, Source: USLM XML via OLRC
Legislative History
Reference
Citation
7 U.S.C. § 8107a
Title 7, Agriculture
Last Updated
Sep 22, 2026
Release point: 119-110