§823e Promoting hydropower development at existing nonpowered dams

Title 16 › Chapter CHAPTER 12— - FEDERAL REGULATION AND DEVELOPMENT OF POWER › Subchapter SUBCHAPTER I— - REGULATION OF THE DEVELOPMENT OF WATER POWER AND RESOURCES › § 823e

Last updated Apr 6, 2026|Official source

Summary

The Federal Energy Regulatory Commission (FERC) may approve or change licenses for certain small hydropower projects that meet special rules. FERC must adopt, within 180 days after October 23, 2018, a faster licensing process for those projects. FERC must set up a task force with the right federal and state agencies and Indian tribes to coordinate permits and approvals. That task force must try to make sure adding power does not cause any material change to how the existing nonpowered dam stores, releases, or flows water. The fast process should aim to give a final license decision within 2 years after a complete application. Before issuing a license, FERC must check the safety of any related non-Federal dam or structure and apply its dam safety rules for the life of the license. Agencies working together on the environmental review under NEPA are allowed to talk and coordinate and that does not stop them from taking part in the formal licensing process, provided cooperating staff are kept separate from staff who take part in the proceeding. Within 12 months after October 23, 2018, FERC and the Secretaries of the Army, Interior, and Agriculture must make a public list of Federal dams that have the greatest potential for non-Federal hydropower. They may consider compatibility with the dam’s purpose, nearby power lines, existing studies, and effects on dam operations. FERC must give that list to the House Committees on Energy and Commerce; Transportation and Infrastructure; and Natural Resources; and to the Senate Committees on Environment and Public Works and Energy and Natural Resources. Definitions (one line each): “qualifying criteria” — the rules a project must meet; “qualifying facility” — a project that meets those rules; “qualifying nonpowered dam” — an older dam not already generating hydropower. This section does not change FERC’s existing licensing powers or its ability to grant small-hydro exemptions under PURPA.

Full Legal Text

Title 16, §823e

Conservation — Source: USLM XML via OLRC

(a)(1)As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.
(2)Not later than 180 days after October 23, 2018, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.
(3)(A)In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
(B)The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
(4)The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.
(b)(1)Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal structures related to the qualifying facility (including possible consequences associated with failure of such structures).
(2)In issuing any license for a qualifying facility at a non-Federal dam, the Commission shall ensure that the Commission’s dam safety requirements apply to such qualifying facility, and the associated qualifying nonpowered dam, over the term of such license.
(c)Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—
(1)be considered to be ex parte communications under Commission rules; or
(2)preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act 11 So in original. Probably should be followed by “of 1969”. (42 U.S.C. 4321 et seq.) and staff participating in the applicable proceeding under this subchapter.
(d)(1)Not later than 12 months after October 23, 2018, the Commission, with the Secretary of the Army, the Secretary of the Interior, and the Secretary of Agriculture, shall jointly develop a list of existing nonpowered Federal dams that the Commission and the Secretaries agree have the greatest potential for non-Federal hydropower development.
(2)In developing the list under paragraph (1), the Commission and the Secretaries may consider the following:
(A)The compatibility of hydropower generation with existing purposes of the dam.
(B)The proximity of the dam to existing transmission resources.
(C)The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.
(D)The effects of hydropower development on release or flow operations of the dam.
(3)The Commission shall—
(A)provide the list developed under paragraph (1) to—
(i)the Committee on Energy and Commerce, the Committee on Transportation and Infrastructure, and the Committee on Natural Resources, of the House of Representatives; and
(ii)the Committee on Environment and Public Works, and the Committee on Energy and Natural Resources, of the Senate; and
(B)make such list available to the public.
(e)For purposes of this section:
(1)The term “qualifying criteria” means, with respect to a facility—
(A)as of October 23, 2018, the facility is not licensed under, or exempted from the license requirements contained in, this subchapter;
(B)the facility will be associated with a qualifying nonpowered dam;
(C)the facility will be constructed, operated, and maintained for the generation of electric power;
(D)the facility will use for such generation any withdrawals, diversions, releases, or flows from the associated qualifying nonpowered dam, including its associated impoundment or other infrastructure; and
(E)the operation of the facility will not result in any material change to the storage, release, or flow operations of the associated qualifying nonpowered dam.
(2)The term “qualifying facility” means a facility that is determined under this section to meet the qualifying criteria.
(3)The term “qualifying nonpowered dam” means any dam, dike, embankment, or other barrier—
(A)the construction of which was completed on or before October 23, 2018;
(B)that is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and
(C)that, as of October 23, 2018, is not generating electricity with hydropower generating works that are licensed under, or exempted from the license requirements contained in, this subchapter.
(f)Nothing in this section affects—
(1)any authority of the Commission to license a facility at a nonpowered dam under this subchapter; and
(2)any authority of the Commission to issue an exemption to a small hydroelectric power project under the Public Utility Regulatory Policies Act of 1978.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

References in Text

The National Environmental Policy Act of 1969, referred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see

Short Title

note set out under section 4321 of Title 42 and Tables. The Public Utility Regulatory Policies Act of 1978, referred to in subsec. (f)(2), is Pub. L. 95–617, Nov. 9, 1978, 92 Stat. 3117. For complete classification of this Act to the Code, see

Short Title

note set out under section 2601 of this title and Tables.

Reference

Citations & Metadata

Citation

16 U.S.C. § 823e

Title 16Conservation

Last Updated

Apr 6, 2026

Release point: 119-73