Title 43 › Chapter CHAPTER 12— - RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT › Subchapter SUBCHAPTER IV— - CONSTRUCTION OF SMALL PROJECTS › § 422d
Require any plan to build a project to include a detailed plan and cost estimate like those used for Federal reclamation projects. The plan must be sent to the State(s) in the project's drainage basin for review (or only the State(s) where the project sits if it is just fixing an existing project). The plan must show how capital costs are split among the project’s functions so single-use facilities pay only for that use and shared facilities split costs fairly. Money spent to protect fish and wildlife is counted as a project cost and is allocated to the appropriate functions. Show that the local organization already has or can get all needed land, rights, and water use rights and that it can pay part of the project cost without Federal loans or grants. The Secretary normally requires the organization to pay at least 25% of the allowable estimated cost, but may lower that to no less than 10% if the group can’t get reasonable outside financing. When sending a proposal to Congress the Secretary must include lender letters or other proof of that inability to borrow. The Secretary will count prior survey and planning work, lands and rights-of-way, and the $5,000 fee toward the required contribution, and will not count certain Federal grants in the project cost. The Secretary and the State must find the project financially feasible and an acceptable risk, certify soil and irrigability information, check for toxic return flows, and may reserve needed Federal lands for up to two years. The Secretary may raise the requested loan or grant to cover price increases within allowed limits. No Federal money can be approved until 60 calendar days after the Secretary sends the approval to Congress (not counting days when either House is out for more than three days to a set date), unless the relevant House or Senate committee disapproves. The Secretary must consider financial feasibility and urgent need, and local organizations keep control of constructed works under the repayment contract.
Full Legal Text
Public Lands — Source: USLM XML via OLRC
Legislative History
Reference
Citation
43 U.S.C. § 422d
Title 43 — Public Lands
Last Updated
Apr 6, 2026
Release point: 119-73