Title 43Public LandsRelease 119-73

§591a Boise project, Idaho; Arrowrock Dam; installment payments of costs of repairs, resurfacing, improvement, etc.

Title 43 › Chapter CHAPTER 12— - RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT › Subchapter SUBCHAPTER XVII— - LEGISLATION APPLICABLE TO PARTICULAR PROJECTS GENERALLY › § 591a

Last updated Apr 6, 2026|Official source

Summary

The Secretary of the Interior can let the Arrowrock irrigation districts, ditch companies, and water users who agreed to pay their share spread the costs of repairing, resurfacing, improving, and raising Arrowrock Dam over twenty yearly payments instead of making one big payment in a single year. This is to avoid a very large maintenance bill in one year and to keep the charges affordable; raising the dam adds capacity to make up for storage lost to silt deposits. The Secretary decides the amount of those costs and that decision is final. The Secretary may also, at his choice, treat those costs as part of the dam’s construction charges under amendatory contracts under subchapter X and have them paid the same way as construction charges.

Full Legal Text

Title 43, §591a

Public Lands — Source: USLM XML via OLRC

For the purpose of avoiding an unduly high operation and maintenance assessment in any one year and to keep the operation and maintenance charges in connection with the Arrowrock Division of the Boise reclamation project within the ability of the water users to pay, the Secretary of the Interior is authorized to allow the irrigation districts of the said Arrowrock Division and the irrigation districts ditch companies, and water users who have assumed obligations to pay proportionate parts of the estimated cost of the operation and maintenance of the Arrowrock Reservoir, to pay the costs, as determined conclusively by said Secretary, incurred in the repair, resurfacing, and improvement of the Arrowrock Dam and in increasing the height thereof (to provide additional capacity to offset past and, to some extent, future losses of capacity resulting from the deposit of silt in the said reservoir) in twenty annual installments instead of requiring the payment of all of such operation and maintenance costs in one year as provided in section 492 of this title: Provided, That such costs, for the purpose of any amendatory contracts affecting the construction charges of Arrowrock Dam that may be entered into as authorized by subchapter X of this chapter, may, in the discretion of the Secretary, be treated as part of the construction charges of said dam, and as payable in the same manner as such charges.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

References in Text

Subchapter X (§ 485 et seq.) of this chapter, referred to in text, was in the original a reference to act of Aug. 4, 1939 (53 Stat. 1187), which is known as the Reclamation Project Act of 1939, and which enacted subchapter X of this chapter, section 375a, 380a, and 387 to 389 of this title, and section 16d of former Title 41, Public Contracts, and enacted provision set out as a note under section 485j of this title. For complete classification of this Act to the Code, see section 485k of this title and Tables.

Reference

Citations & Metadata

Citation

43 U.S.C. § 591a

Title 43Public Lands

Last Updated

Apr 6, 2026

Release point: 119-73