Section 45Y Clean Electricity Production Credit and Section 48E Clean Electricity Investment Credit
Published Date: 1/15/2025
Rule
Summary
Starting January 15, 2025, new IRS rules make it easier for clean energy projects and energy storage to get tax credits. If you own or invest in clean electricity facilities placed in service after 2024, these rules help figure out emissions and credit eligibility. This means more money back for folks powering a greener future!
Analyzed Economic Effects
9 provisions identified: 3 benefits, 5 costs, 1 mixed.
Credit Phase-Out Trigger and Irreversible Determination
The applicable year that begins the section 45Y and 48E credit phase-out is the later of 2032 or the calendar year in which U.S. annual greenhouse gas (GHG) emissions from electricity production are equal to or less than 25 percent of 2022 emissions. The credit phases out over the four-year period after the applicable year, and the Treasury's determination of the applicable year cannot be reversed.
Final IRS Rules for Clean Electricity Credits
Starting January 15, 2025, final IRS regulations implement the clean electricity production credit (section 45Y) and clean electricity investment credit (section 48E). The rules apply to taxpayers claiming those credits with respect to qualified facilities or energy storage technologies placed in service after 2024.
Metering Standards for Credit Eligibility
The final rules require a metering device to meet the American National Standards Institute C12.1-2022 standard (or later revision), be revenue grade with +/-0.5% accuracy, and be properly calibrated and maintained. The regulations allow third-party operation (including remote operation) and do not require the meter to be located at the point of interconnection so long as it meets the standards.
Related-Party Sales Can't Bypass Metering Rule
The Treasury and IRS declined to adopt the Notice 2008-60 approach for section 45Y; a sale to a related person for resale does not count as a sale to an unrelated person for section 45Y purposes unless the qualified facility has a metering device owned and operated by an unrelated person as described in section 45Y(a)(1)(A)(ii).
10-Year Credit Period Tied to Original In-Service Date
A 'qualified facility' is treated as such only during the 10-year period beginning on the date the facility was originally placed in service. If a facility placed in service earlier later operates with zero GHG emissions, it may claim the section 45Y credit only for taxable years within that original 10-year window.
No De Minimis Emissions Exception Allowed
The final regulations do not create a de minimis exception: a facility must have a greenhouse gas emissions rate 'not greater than zero' to be a qualified facility for a taxable year. Temporary or limited periods of greater-than-zero emissions disqualify the facility for those taxable years, although the facility may qualify in other taxable years within its 10-year period if it meets the zero-emissions requirement then.
CHP and Nuclear Thermal Output Counting Toward Credits
For combined heat and power (CHP) property, thermal energy output is included when computing kilowatt-hours for the section 45Y credit (for example, 1 kWh electricity + 1 kWh thermal can count as 2 kWh). The final rules also permit using a nuclear reactor's thermal output as the functional equivalent of the 'lower heating value' for calculating CHP energy efficiency.
80/20 Rule Lets Some Retrofits Qualify as New
Under the 80/20 Rule a retrofitted qualified facility is treated as originally placed in service if the fair market value of used components in the unit of qualified facility is not more than 20 percent of the total value of that unit. The rule applies at the qualified facility level (not turbine-by-turbine for hydropower) and, if met, the facility may claim the full section 45Y credit rather than only credit for added capacity.
Energy Storage Technology (EST) Credit Clarifications
The final rules clarify that energy storage technology (EST) may include electrical or thermal storage (the provisions are disjunctive). An EST can be eligible for section 48E even if co-located with a qualified facility claiming section 45 or 45Y credits, but a unit of EST and a unit of qualified facility cannot share components for 48E. Electrical energy storage property must have a nameplate capacity of not less than 5 kWh, and the qualified investment for EST is the basis of the EST placed in service.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Related Federal Register Documents
2026-12324 — Reducing Bureaucracy and Burden for Native American Programs
This new rule cuts out old, confusing paperwork and rules for Native American programs, making it easier for tribes and Native organizations to get grants and support. It affects Native communities across the U.S. and kicks in on August 17, 2026, helping save time and reduce hassle without changing funding amounts. Basically, it’s a smoother, faster way to boost Native-led projects and community growth.
2026-12272 — Resin Acids, Esters With Glycerol in Pesticide Formulations; Exemption From the Requirement for a Tolerance
The EPA just made it official: resin acids mixed with glycerol can be used in pesticides on crops without worrying about residue limits. This means farmers, food makers, and pesticide companies get a smoother ride—no more setting max residue levels for this ingredient. The rule kicks in June 18, 2026, and if anyone wants to object, they have until August 17, 2026 to speak up.
2026-12303 — Fisheries of the Exclusive Economic Zone off Alaska; Cook Inlet; Final 2026 Harvest Specifications for Salmon
The 2026 salmon fishing rules for Cook Inlet, Alaska, are set and ready to go starting June 17, 2026. These new limits help protect salmon populations while supporting local fishermen and communities. If you fish or buy salmon from this area, expect smart management that balances nature and business through next year.
2026-12376 — Final Waivers and Extensions of the Project Periods With Funding for the American Indian Vocational Rehabilitation Services Program and the American Indian Vocational Rehabilitation Training and Technical Assistance Center
The Department of Education is giving 43 American Indian Vocational Rehabilitation Services projects and one Training and Technical Assistance Center extra time and money to keep helping through September 30, 2027. They’re waiving rules that usually limit projects to five years so these programs can continue their important work without interruption. This extension starts July 20, 2026, making sure support for American Indian communities stays strong and steady.
2026-12277 — Special Conditions: Honeywell Aerospace US LLC, Dassault Aviation Model Falcon 900EX Airplane; Electronic System Security Protection From Unauthorized External Access
Honeywell Aerospace is upgrading the Dassault Falcon 900EX with new digital systems that connect the plane to outside networks like the internet and wireless devices. Because this is a new kind of tech for airplanes, the FAA is setting special safety rules to keep hackers out and protect the plane’s electronics. These rules take effect June 18, 2026, and Honeywell must follow them to keep flights safe without extra costs for passengers.
2026-12307 — Fisheries of the Northeastern United States; Summer Flounder Fishery; Quota Transfer From North Carolina to Virginia
North Carolina is sharing part of its 2026 summer flounder fishing quota with Virginia to help both states meet their fishing goals. This change starts June 17, 2026, and lasts through the end of the year, making sure the fishery stays balanced and fair. Commercial fishers in both states will see updated limits, keeping the summer flounder fishery healthy and on track.
Previous / Next Documents
Previous: 2025-00073 — Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Corrections To Conform to Judicial Review
Starting January 15, 2025, pipeline companies must follow updated safety rules after a court removed some parts of the 2022 gas pipeline safety law. These changes affect how gas pipelines are checked and fixed, especially around corrosion and cracks, making sure repairs happen on time without extra costs. This update keeps pipelines safer and clearer for everyone involved.
Next: 2025-00327 — Voluntary Fiduciary Correction Program
The updated Voluntary Fiduciary Correction Program helps employers and plan managers fix mistakes with retirement plans without facing penalties. It’s easier to use, covers more types of fixes, and adds a way to self-correct late payments and loan issues. These changes kick in on March 17, 2025, giving folks a smoother path to stay on the right side of the law and protect workers’ retirement money.