FCC Corrects Rules for How Robot Cars Will Chat
Published Date: 1/17/2025
Rule
Summary
The FCC fixed some details in their December 2024 rule about switching 5.9 GHz band tech from old DSRC to new C-V2X for smarter car communication. This update mostly affects companies and agencies using this band, with some changes kicking in February 11, 2025, and others delayed until December 14, 2026. No big money shifts, just clearer rules to keep the tech upgrade smooth and on track!
Analyzed Economic Effects
4 provisions identified: 4 benefits, 0 costs, 0 mixed.
Key Effective Dates for 5.9 GHz Rule
The FCC correction makes the final rule effective February 11, 2025. However, a set of specific amendments (for example, changes to 47 CFR 90.7; 90.149(b); 90.155(i); 90.179(f); 90.210; 90.213; 90.350; removal of 47 CFR 90.370–90.384; and removal of 47 CFR 95.3105–95.3189) are effective December 14, 2026.
DSRC-to-C‑V2X Transition Clarified
The correction clarifies the December 13, 2024 final rule about transitioning 5.9 GHz Intelligent Transportation Systems (ITS) operations from Dedicated Short Range Communications (DSRC) technology to cellular-vehicle-to-everything (C‑V2X) technology. The corrected final rule is effective February 11, 2025.
Which Licenses Count as 'Covered'
The correction updates the definition of 'Covered geographic licenses' to explicitly list many services. The list includes, among others, Intelligent Transportation Systems Radio Service in the 5895–5925 MHz band (excluding public safety licenses), 1.4 GHz, 1.6 GHz, 24 GHz, 218–219 MHz, 600 MHz, 700 MHz commercial services, 800/900 MHz Specialized Mobile Radio services, 3.45 GHz, and 3.7 GHz services.
Corrected 5.9 GHz Channel Blocks
The correction fixes Table 1 to paragraph (a) in 47 CFR 90.390 to show specific channel blocks in the 5.9 GHz band. The table lists 20‑MHz channels 5895–5905 MHz, 5905–5915 MHz, and 5915–5925 MHz; 30‑MHz channels 5895–5915 MHz and 5905–5925 MHz; and references the 5895–5925 MHz range.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Related Federal Register Documents
2026-11904 — Establishment of Class E Airspace; Mullin, TX
The FAA is creating new Class E airspace around Smoky Bend Ranch Airport in Mullin, TX to help pilots fly safely using instruments, especially in bad weather. This change starts on October 29, 2026, and mainly affects pilots flying under instrument flight rules (IFR). No extra costs for the public, just smoother and safer skies for everyone!
2026-11849 — Revising HUD's Noise Abatement and Control Regulations
HUD is updating its rules to better control noise around housing, making neighborhoods quieter and more comfortable for everyone. These changes affect people living in HUD-supported homes and aim to improve how noise is measured and managed. The new rules will roll out soon, with no extra costs for residents, just a smoother, quieter living experience.
2026-11861 — Establishment of Class E Airspace; Freer, TX
The FAA is creating new Class E airspace around Silverhorn Ranch Airport in Freer, TX, to support safer flying with new instrument flight rules. This change starts on October 29, 2026, and mainly affects pilots flying in and out of this airport. No extra costs for the public, just smoother and safer skies for everyone!
2026-11860 — Establishment of Class E Airspace; Canton, OH
The FAA is creating new Class E airspace around Canton, Ohio to make flying safer and more organized for pilots. This change affects local pilots and air traffic controllers, with no extra costs or delays expected. The new airspace rules will kick in soon to keep the skies smooth and secure.
2026-11884 — Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction
The EPA is rolling back part of its previous decision that said six states or local agencies didn’t update their pollution plans for startup, shutdown, and malfunction emissions. This change follows a court ruling and means some deadlines and penalties no longer apply. It gives these agencies more time and flexibility without immediate money or sanction hits.
2026-11838 — Drawbridge Operation Regulation; Big Carlos Pass, Estero Island, FL
The Coast Guard is officially removing the old drawbridge rules for the SR 865 Bridge at Big Carlos Pass, FL, because the drawbridge was replaced with a fixed bridge in April 2026. This means boaters and drivers no longer need to worry about bridge openings or delays. The change takes effect June 12, 2026, and won’t cost anyone extra or cause any disruptions.
Previous / Next Documents
Previous: 2025-00573 — Drawbridge Operation Regulation; Umpqua River, Reedsport, OR
The Coast Guard is updating the rules for the railroad bridge over the Umpqua River in Reedsport, Oregon. They’re renaming the bridge to the Umpqua River railroad bridge, letting it stay closed to boats when needed, and removing the fog signal requirement. These changes start February 18, 2025, and mainly affect boaters and the railroad company, with no extra costs involved.
Next: 2025-00703 — Procedural Rules
The Federal Mine Safety and Health Review Commission updated its procedural rules to make mine safety cases faster, fairer, and less costly. These changes affect anyone involved in mine safety legal cases and take effect on March 3, 2025. You can still send your comments until February 18, 2025, so don’t miss your chance to weigh in!