2025-02051RuleWallet

FAA Targets Faulty Seatbelt Buckles on Planes and Helicopters

Published Date: 1/31/2025

Rule

Summary

The FAA is updating safety rules for certain airplane and helicopter seatbelt buckles made by Pacific Scientific Company. If you own or operate these aircraft, you’ll need to check and fix specific buckles by March 7, 2025, following new instructions that narrow down which buckles are affected. This keeps everyone flying safer without causing big costs or delays.

Analyzed Economic Effects

5 provisions identified: 3 benefits, 2 costs, 0 mixed.

Mandatory inspections, measurements, replacements

If your aircraft has Pacific Scientific plastic rotary buckles P/N 1111430 or 1111475 manufactured on or before May 31, 2007 (or with unknown manufacture date), you must inspect the buckle handle for cracks within 6 months after March 7, 2025, and measure the buckle handle vane thickness within 12 months. If a crack is found or the vane thickness is greater than 0.125 inch, you must remove and replace the buckle or the restraint system before further flight. As of March 7, 2025, you may not install any plastic buckle P/N 1111430 or 1111475 with a vane thickness greater than 0.125 inch on any airplane or helicopter unless it was repaired after May 31, 2007 and marked with a BLUE logo.

FAA cost estimate and repair pricing

The FAA estimates the AD affects up to 1,435 restraint systems on U.S.-registered aircraft. Labor is estimated at $85 per hour. Replacing one buckle is estimated at 0.5 work-hour plus $636 parts for a total of $679 per buckle replacement; replacing a restraint system is estimated at 0.5 work-hour plus $1,031 parts for a total of $1,074 per restraint system replacement.

Who is excluded from the AD

This AD does not apply to plastic buckles repaired with an airworthy buckle handle installed after May 31, 2007 and marked with a BLUE logo on the center button, and it does not apply to buckles made of metal. The applicability is limited to plastic Pacific Scientific buckles P/N 1111430 and P/N 1111475 with a date of manufacture on or before May 31, 2007 or unknown manufacture date.

Credit for prior inspections and measurements

If you already inspected buckles for cracks using Pacific Scientific SB 25-1111432 (May 22, 2007) or Meggitt SB 25-1111432 Rev 001 (May 20, 2021), that meets the inspection requirement. If you measured vane thickness and replaced affected buckles before March 7, 2025 using those same service bulletins, you get credit for that work.

Special flight permits and AMOC continuity

Special flight permits may be issued under 14 CFR 21.197 and 21.199 provided there are no passengers onboard. Also, AMOCs (alternative methods of compliance) approved for AD 2021-07-13 are approved for the corresponding requirements of this AD, and the FAA provides the usual AMOC process under 14 CFR 39.19.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Published Date
Rule Effective
1/31/2025
3/7/2025

Department and Agencies

Department
Independent Agency
Agency
Transportation Department
Federal Aviation Administration
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register