Miami River Bridge Stays Shut for Boats Amid Rail Construction
Published Date: 4/4/2025
Rule
Summary
The Coast Guard is changing the rules for the FDOT Railroad Bridge on the Miami River in Miami, FL, because a new nearby railroad bridge is being built. While construction happens, this bridge will stay closed and won’t open for boats. This affects boaters who need to pass through, but it helps keep the project on track without extra costs or delays.
Analyzed Economic Effects
1 provisions identified: 0 benefits, 1 costs, 0 mixed.
Miami River Drawbridge Closed to Boats
The FDOT Railroad Bridge across the Miami River, North Fork, mile 5.3, at Miami, FL will remain closed and will not open for boats while construction of an adjacent railroad bridge is underway. This closure is temporary and lasts until the nearby bridge construction is complete, and it affects boaters who need to pass through that location.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-08699 — Shipping Safety Fairways Along the Atlantic Coast
The Coast Guard is making the Atlantic Coast safer for ships by setting up special shipping lanes from New York to Florida. They’re reopening the comment period until June 22, 2026, so everyone can share their thoughts before the rules are finalized. This affects ship operators and coastal communities, aiming to keep sea travel smooth and safe without extra costs right now.
2026-11727 — Availability of Retrospective Analysis of 2012 Ballast Water Discharge Standards
The Coast Guard just released a fresh look at the 2012 rules that control what ships can dump in U.S. waters to keep invasive critters out. This new report checks if the original costs and benefits still add up using updated info. Ship owners, environmental groups, and the public can weigh in by August 10, 2026, to help shape future decisions—no wallet surprises yet, just smarter rules ahead!
2026-11725 — Regulated Navigation Area; Piscataqua River, Newington, NH
Starting June 11, 2026, the Coast Guard is setting up special rules on the Piscataqua River near the General Sullivan Bridge in Newington, NH, because the bridge is being taken down. Boats must slow down, can’t be wider than 160 feet, and sometimes won’t be allowed through at all during risky demolition work. These rules will last until March 31, 2027, keeping everyone safe without costing boaters extra fees.
2026-11789 — Special Local Regulation; Ohio River, Henderson, KY
On July 3, 2026, from 9 p.m. to 10 p.m., the Coast Guard will temporarily block off part of the Ohio River near Henderson, KY, to keep everyone safe during a big fireworks show. Boats can’t enter the area unless they get special permission. This quick rule helps protect people and vessels from fireworks hazards without any extra fees or delays.
2026-11747 — Safety Zones; Annual Events in the Captain of the Port Eastern Great Lakes Zone
The Coast Guard is setting up safety zones on the water for fun annual events in the Eastern Great Lakes this July 2026. Boat operators must follow rules and listen to Coast Guard directions during these times to keep everyone safe. These temporary zones might delay some boaters but won’t cost extra money.
2026-11724 — Safety Zones; Annual Events in the Captain of the Port Detroit Zone
On July 4, 2026, from 9:30 p.m. to 11 p.m., the Coast Guard will enforce a safety zone on the Maumee River in Toledo during the 4th of July fireworks to keep everyone safe. No boats can enter the area without permission, and if bad weather hits, the same rules apply on July 5. This affects boaters and helps protect people and property during the celebration.
Previous / Next Documents
Previous: 2025-05740 — Fisheries of the Exclusive Economic Zone Off Alaska; Gulf of Alaska; Final 2025 and 2026 Harvest Specifications for Groundfish; 2025 Rockfish Program Cooperative Allocations
The government just set the final fishing limits for groundfish in the Gulf of Alaska for 2025 and 2026, including how much rockfish each fishing group can catch. This helps commercial fishermen plan and make the most money while keeping fish populations healthy. These new rules kick in soon, so fishing crews should get ready to follow the updated catch limits.
Next: 2025-05778 — Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Osprey, FL
The Coast Guard is updating the Blackburn Point Bridge schedule in Osprey, FL, to cut down on weekday drawbridge openings during busy traffic times. This change helps drivers avoid traffic jams without messing up boat traffic too much. If you drive or boat around here, expect smoother road trips and a new bridge routine soon!