FAA Updates Payson Airspace and Corrects Airport Records
Published Date: 5/20/2025
Rule
Summary
The FAA is updating the Class E airspace around Payson, AZ because the old navigation beacon was removed. They’re also fixing the airport’s name and location info to match official records. These changes start on August 7, 2025, and help pilots fly safely using instruments without costing anyone extra.
Analyzed Economic Effects
3 provisions identified: 3 benefits, 0 costs, 0 mixed.
Payson's Class E Airspace Expanded
If you fly near Payson Airport, the Class E controlled airspace now extends upward from 700 feet within a 20.9-mile radius of the airport, increased from a 6-mile radius. This change supports instrument flight rule (IFR) operations and becomes effective 0901 UTC on August 7, 2025.
Payson NDB Removed from Legal Description
The Payson non-directional beacon (NDB) and its associated extension are removed from the airspace legal description because the NDB was decommissioned. This amendment is part of the airspace review that supports IFR operations and is effective 0901 UTC on August 7, 2025.
No Significant Economic Impact on Small Entities
The FAA certified that this airspace amendment does not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act. The rule is described as routine and the FAA determined the anticipated economic impact is minimal.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-14992, Normalizing Unmanned Aircraft Systems Beyond Visual Line of Sight Operations
The FAA and TSA want to make flying drones beyond what you can see easier and safer for everyone. This new rule will help businesses and hobbyists use drones for things like deliveries, farming, and surveys without needing to keep the drone in sight all the time. If you’re involved in drone flying or services, get ready for new rules by October 6, 2025, that could open up cool new drone opportunities while keeping skies secure.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
Previous / Next Documents
Previous: 2025-09002, Amendment of Domestic Very High Frequency Omnidirectional Range (VOR) Federal Airways V-1, V-29, V-38, V-139, and V-286; Eastern United States
The FAA is updating some important flight paths in the eastern U.S. because two key navigation stations in Maryland are shutting down. These changes affect pilots flying along VOR airways V-1, V-29, V-38, V-139, and V-286 and will take effect on August 7, 2025. No extra costs for travelers, just smoother and safer skies as the FAA modernizes its navigation system.
Next: 2025-09007, Airworthiness Directives; General Electric Company Engines
If you own or operate certain General Electric CF6-80E1 engines, listen up! The FAA found some turbine disks made with metal that might have tiny iron bits, which could cause cracks or breaks. Starting June 24, 2025, those disks must be swapped out to keep flights safe—so plan for inspections and replacements that might cost some time and money.