FAA Orders Crack Checks for Pratt & Whitney Engine Parts
Published Date: 6/2/2025
Proposed Rule
Summary
The FAA wants to keep Pratt & Whitney engines safe by checking certain parts for cracks that could cause engine trouble or shutdowns. If cracks are found, parts must be replaced to avoid accidents. This affects specific engine models and requires inspections starting soon, with comments open until July 17, 2025, so operators should prepare for some maintenance costs and schedule updates.
Analyzed Economic Effects
4 provisions identified: 0 benefits, 4 costs, 0 mixed.
Mandatory recurring inspections of HPT parts
If your airplane uses the listed Pratt & Whitney engines, you must do angled ultrasonic inspections (AUSIs) of the high-pressure turbine (HPT) 1st-stage disk and the turbine hub at the next piece-part exposure after the AD’s effective date and at every piece-part exposure thereafter. If any crack indication is found during those inspections, you must remove the affected part from service and replace it with a part eligible for installation.
Estimated fleet impact and repair costs
The FAA estimates this proposed AD would affect 484 engines on U.S. registry. Each AUSI is estimated at 5 work-hours (5 x $85/hr) for a cost of $425 per inspection. The FAA estimates 13 engines will require replacement of the HPT lenticular seal assembly. On-condition replacement cost estimates are $730,850 per HPT 1st-stage disk replacement (10 work-hours plus $730,000 parts) and $500,850 per turbine hub replacement (10 work-hours plus $500,000 parts). Comments on the proposal are due by July 17, 2025.
Mandatory removal of specific seal assemblies
For engines with an installed HPT lenticular seal assembly having part number 1B8575 and any of these serial numbers: DKLBGY5919, DKLBGY5922, DKLBGY5945, DKLBGY5936, DKLBGY5944, DKLBGY5946, DKLBGY5948, DKLBGY5949, DKLBGY5952, DKLBGY5953, DKLBGY5959, DKLBG48210, DKLBG48244, or DKLBG48292, you must remove the seal assembly from service at the next piece-part exposure and replace it with a part eligible for installation.
Installation bans for certain disk and hub parts
As of the AD’s effective date, you may not install HPT 1st-stage disks with P/N 1B7801, 1B3601, or 1B3601-001, or turbine hubs with P/N 1B4902, 1B6602, or 1B8002 on any engine unless the part is a "part eligible for installation" (for example, it has passed the required AUSI or has the specified certificate of conformance). You also may not install any HPT lenticular seal assembly listed in the figure of the AD.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
2025-03853, Enforcement Policy Regarding “Drug and Alcohol Testing of Certificated Repair Station Employees Located Outside of the United States; Correction”
The FAA is giving repair stations outside the U.S. a break by delaying enforcement of new drug and alcohol testing rules until March 20, 2025. This means affected repair stations don’t have to worry about penalties if they aren’t fully following the updated rules just yet. The delay helps everyone get ready without rushing or extra costs.
Previous / Next Documents
Previous: 2025-09895, Airworthiness Directives; Airbus Helicopters
The FAA wants Airbus Helicopters Model AS 332L2 and EC 225LP owners to swap out some bolts on the main gearbox suspension bar because the current ones might be too long or bent. They’ll also need to check the old bolts and tell Airbus what they find. This fix keeps helicopters safe and comments on the plan are open until July 17, 2025.
Next: 2025-09931, Prevailing Rate Systems; Abolishment of Hennepin, Minnesota, as a Nonappropriated Fund Federal Wage System Wage Area
The Office of Personnel Management wants to stop treating Hennepin, Minnesota, as its own special wage area for certain federal jobs because fewer people work there now. Instead, most counties will join nearby wage areas, and those without jobs won’t be assigned at all. This change helps keep pay fair and up-to-date, with comments open until July 2, 2025.