FAA Wants Boeing 767s Checked for Tiny Skin Cracks
Published Date: 7/23/2025
Proposed Rule
Summary
The FAA wants to make sure certain Boeing 767-200 and 767-300 airplanes stay safe by checking for tiny cracks and damage around the plane’s skin and repairs. Some planes will need detailed inspections, while others will get regular crack tests to catch problems early. Owners should act before September 8, 2025, to avoid safety risks and possible repair costs.
Analyzed Economic Effects
4 provisions identified: 1 benefits, 3 costs, 0 mixed.
Repetitive crack inspections for Group 13–14 767s
If your airplane is listed as Group 13 or Group 14 in Boeing Alert Service Bulletin 767-53A0193, Revision 3 (dated June 27, 2024), the AD requires repetitive nondestructive testing inspections for cracking at specific fuselage stringers. For Group 13 this includes stringers S26L and S8R between STA 434 and STA 676; for Group 14 this includes S-26L, S-8R, and S-2R between STA 434 and STA 654+121. The FAA estimates inspections could take up to 340 work-hours (340 × $85 = $28,900) per inspection cycle per airplane and estimates up to $86,700 total per inspection cycle for U.S. operators (for 3 affected U.S. airplanes).
Faster inspections for STC-converted freighters
Model 767-200 airplanes converted by STC ST01433SE and Model 767-300 airplanes converted by STC ST02040SE must have detailed inspections for scribe lines and follow-up actions on a faster schedule. The AD requires reducing initial compliance times by a factor of 0.60 for 767-200s (example: 25,000 flight cycles → 15,000) and by 0.46 for 767-300s (example: 25,000 → 11,500), and reducing repetitive intervals to 10% of the original interval for both types. For these STC-modified airplanes, accomplishing the AD’s initial actions also terminates the requirements of AD 2010-06-16.
Repair-before-flight requirement and limited return option
The AD requires repair of detected scribe lines before further flight except when the operator uses a Limited Return to Service (LRTS) program for qualifying scribe lines. The LRTS program allows a temporary return to service but requires repetitive inspections; to qualify, scribe lines must meet depth and location criteria. Operators can also contact Boeing for final repair instructions; following Boeing’s final repair instructions eliminates the need for the LRTS repetitive inspections.
Credit allowed for earlier Revision 2 work
If you completed the actions required for STC-modified airplanes before the AD’s effective date using Boeing Alert Service Bulletin 767-53A0193, Revision 2 (dated August 26, 2010), the proposed AD gives credit for those previous actions. That means you would not need to repeat those same actions after this AD becomes effective.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
2025-03853, Enforcement Policy Regarding “Drug and Alcohol Testing of Certificated Repair Station Employees Located Outside of the United States; Correction”
The FAA is giving repair stations outside the U.S. a break by delaying enforcement of new drug and alcohol testing rules until March 20, 2025. This means affected repair stations don’t have to worry about penalties if they aren’t fully following the updated rules just yet. The delay helps everyone get ready without rushing or extra costs.
Previous / Next Documents
Previous: 2025-13817, Alternative Method for Calculating Embrittlement for Steel Reactor Vessels
The Nuclear Regulatory Commission (NRC) said no to a request from NuScale Power to change how they calculate steel reactor vessel embrittlement. They found no urgent safety problems or new info to justify updating the rules. This means current safety checks stay as they are, and the petition is officially closed as of July 23, 2025.
Next: 2025-13882, Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Fort Lauderdale, FL
The Coast Guard wants to change how often the SE 17th Street Bridge in Fort Lauderdale opens during weekday rush hours to help reduce car traffic jams. Instead of opening twice an hour, the bridge would open just once an hour during busy times, Monday through Friday. If you care about boat or car travel here, you can share your thoughts by August 25, 2025—no extra costs involved, just smoother traffic!