Boeing 787 Wing Fixes Proposed to Enhance Flight Safety
Published Date: 3/18/2026
Proposed Rule
Summary
If you fly or fix Boeing 787 planes, listen up! The FAA wants to update safety rules by swapping out a part on the wing’s leading edge to keep flights safer and add new maintenance checks. These changes keep all the old safety steps but add new ones, and comments are open until May 4, 2026—so there’s time to weigh in before any costs or work changes kick in.
Analyzed Economic Effects
6 provisions identified: 2 benefits, 4 costs, 0 mixed.
Required Wing Actuator Replacement
If you operate Boeing 787-8/9/10 airplanes identified in the Boeing bulletin, you must replace the leading edge outboard geared rotary actuator (GRA) with a leading edge outboard lockout actuator (LEOLA) at slat 2 and slat 11 locations. The FAA estimates parts cost $31,610 and 9 work-hours at $85/hour ($765) per airplane, for a total cost per airplane of $32,375; the FAA estimates this would affect 174 U.S.-registered airplanes for a U.S. operators cost of $5,633,250.
Maintenance Program Revision Cost Per Operator
Each affected operator must revise its maintenance or inspection program to incorporate a new certification maintenance requirement (27-CMR-14). The FAA estimates revising the maintenance/inspection program takes 90 work-hours per operator at $85/hour, for an average total cost per operator of $7,650.
Addresses Unsafe Slat Condition To Improve Safety
The FAA proposes this AD to address a condition where the leading edge outboard slat system could be out of position without flight deck annunciation, which the FAA says could result in insufficient lift and inability to maintain continued safe flight and landing. Requiring the replacement and checks is intended to mitigate that unsafe condition.
Retained Repetitive Checks and AFM Revision
The proposed AD retains repetitive operational checks and an AFM (airplane flight manual) revision from the prior AD. The FAA estimates each repetitive operational check costs 8 work-hours × $85 = $680 per check and reports a total cost to U.S. operators of $118,320 per operational check; the AFM revision is estimated at 1 work-hour × $85 = $85 per airplane, with a total U.S. operators cost of $14,790.
Who Must Comply and Comment Deadline
This proposed AD applies to The Boeing Company Model 787-8, 787-9, and 787-10 airplanes as identified in Boeing Alert Requirements Bulletin B787-81205-SB270055-00 RB, Issue 002, dated November 25, 2024. The FAA will accept comments on the proposed AD until May 4, 2026.
Manufacturer Warranty May Reduce Costs
The FAA notes that, according to the manufacturer, some or all of the costs of the proposed AD may be covered under warranty, which could reduce the cost impact on affected operators.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-08943 — Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2026-11875 — Petition for Exemption; Summary of Petition Received; NetJets Aviation, Inc.
NetJets Aviation, a big private jet company, asked the FAA to let them skip some usual flight rules. This could change how they operate their planes, and the public has until July 2, 2026, to share their thoughts. No money changes are mentioned yet, but this could speed up or simplify some flights for NetJets.
2026-11861 — Establishment of Class E Airspace; Freer, TX
The FAA is creating new Class E airspace around Silverhorn Ranch Airport in Freer, TX, to support safer flying with new instrument flight rules. This change starts on October 29, 2026, and mainly affects pilots flying in and out of this airport. No extra costs for the public, just smoother and safer skies for everyone!
2026-11904 — Establishment of Class E Airspace; Mullin, TX
The FAA is creating new Class E airspace around Smoky Bend Ranch Airport in Mullin, TX to help pilots fly safely using instruments, especially in bad weather. This change starts on October 29, 2026, and mainly affects pilots flying under instrument flight rules (IFR). No extra costs for the public, just smoother and safer skies for everyone!
2026-11792 — Modification of Class E Airspace, Omak Airport, Omak, WA
The FAA is changing the Class E airspace around Omak Airport in Washington to make flying safer and smoother for pilots using instruments. This update starts on September 3, 2026, and mainly affects pilots flying under instrument flight rules (IFR). No extra costs for the public, just better airspace management to keep flights on track!
2026-11730 — Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
Starting June 11, 2026, the FAA is updating how pilots approach and take off from certain airports to keep flights safe and smooth. These changes affect pilots and airports by adjusting flight paths and safety rules based on new tech and obstacles. No big costs here—just smarter, safer skies for everyone flying under instrument rules!
Previous / Next Documents
Previous: 2026-05322 — Effective Date of Requirement for Premarket Approval Applications for Blood Irradiators Intended To Prevent Metastasis
The FDA is planning to require companies that make blood irradiators used during cancer surgeries to get special approval before selling them. This change helps make sure these devices are safe and effective in preventing cancer spread. If finalized, manufacturers will have about 30 months to submit their approval applications, so they should get ready soon!
Next: 2026-05330 — Poultry Grower Payment Systems and Capital Improvement Systems; Delay of Effective Date
The USDA is pushing back the start date for new rules about how poultry growers get paid and handle big expenses. Instead of starting July 1, 2026, these changes won’t kick in until December 31, 2027. This gives everyone more time to think things over and share their thoughts before the rules take effect.