FAA Greenlights Centennial Airport Noise Blueprint
Published Date: 4/3/2026
Notice
Summary
The FAA has officially approved the noise exposure map for Centennial Airport in Englewood, Colorado, showing current and future noise levels through 2030. This means local residents, businesses, and the airport can better understand and plan for noise impacts. The approval took effect April 1, 2026, paving the way for future noise reduction efforts without immediate costs.
No Economic Impacts Identified for this Document
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-08943 — Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA wants to limit drone flights near important fixed sites like power plants or airports to keep people and property safe. Facility owners can ask for special drone flight restrictions, but they must prove it’s needed for safety or security. Comments on this plan are open until July 6, 2026, and these new rules could change how drone operators fly near sensitive places.
2026-09773 — Airworthiness Directives; Airbus Helicopters
The FAA wants to make sure certain Airbus Helicopters have their engine parts installed correctly to keep flying safe. If you own or operate models like AS350 or EC130, you’ll need to check the main gearbox engine coupling soon and fix any problems found. Comments on this plan are open until June 29, 2026, and while inspections might cost some time and money, they’re key to avoiding bigger issues.
2026-09801 — Airworthiness Directives; Stemme GmbH Gliders
If you own a Stemme S 12 glider, heads up! The FAA wants you to regularly check your fuel system for leaks caused by certain copper rings and replace any faulty ones. This keeps your glider safe and stops risky fuel leaks, with comments on the plan due by June 29, 2026.
2026-09802 — Establishment of Class E Airspace; Winnie, TX
Starting October 29, 2026, the FAA is creating new Class E airspace around Griffith Ranch Airport in Winnie, TX. This change helps pilots fly safely using instruments, especially in bad weather. Local pilots and air traffic controllers will notice smoother, safer flights with no extra costs or delays.
2026-09771 — Airworthiness Directives; Pilatus Aircraft Ltd. Airplanes
Pilatus PC-12 airplane owners and operators, heads up! The FAA is updating safety rules to fix a problem that could affect certain planes, meaning some extra checks or fixes might be needed. Comments on these changes are open until June 29, 2026, so now’s the time to speak up before any costs or work kicks in.
2026-09772 — Airworthiness Directives; Diamond Aircraft Industries Inc. Airplanes
If you own a Diamond DA20-C1 airplane, the FAA wants you to check the emergency locator transmitter (ELT) because a missing wire might stop it from working in an emergency. They’re asking for a quick inspection and fixes if needed to keep you safe. Comments on this plan are open until June 29, 2026, and the fix should be pretty straightforward without breaking the bank.
Previous / Next Documents
Previous: 2026-06551 — Center for Scientific Review; Notice of Closed Meetings
The Center for Scientific Review is holding several closed virtual meetings in late April 2026 to review and decide on important research grant applications. These meetings protect private info and trade secrets while helping decide who gets funding to explore aging, genetics, and dental science. Researchers and institutions applying for grants should watch these dates closely as funding decisions could impact their projects and budgets.
Next: 2026-06555 — Railroad Cost Recovery Procedures-Productivity Adjustment
The Surface Transportation Board says railroads got 1.5% more productive each year from 2020 to 2024. This new productivity number will affect how railroads recover their costs starting April 18, 2026, unless someone spots a mistake and files a comment by April 15. Railroads and anyone tracking their costs should pay attention to this update—it could change the money railroads can charge.