This NPRM seeks to amend the noise emission regulations to address the unique noise emission characteristics of trains operating at speeds exceeding 160 miles per hour (mph). Specifically, the proposed regulation would provide an alternative standard for noise emissions from train operations exceeding 160 mph, up to 220 mph, and also provide a special approval process for noise emissions from train operations exceeding 220 mph. This alternative noise emission standard and compliance process would effectively remove an existing regulatory barrier to the railroad industry for high-speed rail operations, while continuing to protect public health and welfare. Existing noise emission limits for all train operations at speeds up to 160 mph would continue to apply, and these existing limits would remain available for demonstrating compliance at higher speeds as well.
Analyzed Economic Effects
5 provisions identified: 4 benefits, 0 costs, 1 mixed.
Optional High-Speed Noise Standard
The rule would let railroads optionally use a new alternative noise-emission standard for train operations exceeding 160 mph up to 220 mph rather than the existing 40 CFR part 201 limits. FRA says this change would remove an existing regulatory barrier to high-speed rail while keeping protections for public health and welfare.
Testing Costs and Net Benefits
Railroads and rail-equipment manufacturers would need to perform compliance testing if they use the alternative standard; FRA says testing requires sound-measuring equipment, calibration, and personnel. FRA estimates present-value costs of $105,462 (7% discount) or $178,230 (3% discount) over a 30-year analysis, and presents present-value benefits of $65,947,718 (7%) or $100,525,866 (3%).
New Measurement Method and Limits
The proposed alternative uses a baseline equivalent sound level of 96 dB(A) measured at 25 ft for a 160 mph pass-by and would allow an adjusted limit up to about 103 dB(A) at a 220 mph maximum speed; current U.S. standards measure at 100 ft and use a different metric. FRA explains a 25-ft measurement reads about 7–9 dB higher than a 100-ft reading.
Reuse of Prior Test Results and EU Tests
The proposal would let results from a previously tested operation be used to show compliance for any proposed operation up to the same maximum speed (between 160 mph and up to 220 mph). FRA also invites comment on allowing EU NOI TSI test results to be used to demonstrate compliance.
Special Approval for >220 mph Systems
For train operations exceeding 220 mph, the rule would create a special approval process (subpart D) that includes publishing a petition in the Federal Register and an opportunity for public comment. FRA says this would help unique systems (e.g., magnetic levitation or fully enclosed rights-of-way) demonstrate appropriate noise protection.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15605, Qualification and Certification of Locomotive Engineers and Conductors; English Language Proficiency and Other Requirements
FRA proposes to amend its regulations governing the qualification and certification of locomotive engineers and conductors to establish English language proficiency as a requirement for a railroad carrier to certify and recertify locomotive engineers and conductors. FRA also proposes that each railroad carrier conducting a triennial examination of skill performance, and an annual operational monitoring observation for locomotive engineers, which are current requirements, conduct those examinations and observations without engaging energy management systems that limit the need for a locomotive engineer to operate the throttle or braking systems. Further, FRA proposes to codify limitations on operations at the southern border, including a 10 route-mile geographic limitation, to ensure domestic training, testing, and certification requirements for Mexican crew members are adequate. In addition, FRA proposes changes to clarify that a locomotive engineer or conductor's territorial qualification is limited to the specific direction of travel traversed during the qualification process.
2026-14328, Notice of Petition for Waiver of Compliance
CSX Transportation asked the Federal Railroad Administration to let some of their long-haul trains run up to 1,785 miles before needing certain brake tests and inspections. This change affects trains on approved routes with special safety detectors and aims to keep safety strong while making operations smoother. People can share their thoughts on this by September 14, 2026.
2026-14324, Notice of Petition for Amendment of Waiver of Compliance
The American Short Line and Regional Railroad Association wants to add 8 more railroads to a special rule that changes work-hour limits for train workers. This affects those railroads and their employees by allowing some flexibility in hours, with safety training included. The public can share their thoughts by September 14, 2026, before any decision is made.
2026-14161, Certification of Signal Employees; Extension of Comment Period
The Federal Railroad Administration (FRA) is giving signal employees and their representatives more time to share their thoughts on a proposed rule change. This rule would cancel the current requirement for signal employees to be certified, which could affect how these workers are trained and checked. The comment period is now extended until August 13, 2026, so everyone can weigh in before any final decisions are made.
2026-13787, Proposed Agency Information Collection Activities; Comment Request
The Federal Railroad Administration (FRA) is asking for your thoughts on a new paperwork plan they want to send to the Office of Management and Budget for approval. This affects anyone who deals with FRA’s info requests, but so far, no one has shared any comments. You’ve got until August 7, 2026, to speak up before the paperwork gets the green light, and there’s no expected cost change for those involved.
2026-13785, Proposed Agency Information Collection Activities; Comment Request
The Federal Railroad Administration (FRA) is asking for your thoughts on a paperwork plan they want to keep using. This plan affects people and businesses involved with railroads and won’t cost extra money or add new forms. You’ve got until August 7, 2026, to share your ideas before the government makes a final call.
Previous / Next Documents
Previous: 2026-15717, Ventilation Plan Approval Criteria
In response to a public request, the Mine Safety and Health Administration (MSHA) is reopening the rulemaking record and is scheduling a virtual public hearing on the Agency's proposed rule published on July 1, 2025, titled, "Ventilation Plan Approval Criteria."
Next: 2026-15725, Auction of Flexible-Use Licenses in the Upper C-Band for Next-Generation Wireless Services Scheduled for April 27, 2027; Comment Sought on Competitive Bidding Procedures for Auction 115
The FCC is gearing up to auction 3,248 flexible-use licenses in the 3.98-4.14 GHz band on April 27, 2027, opening doors for next-gen wireless services. Companies interested in these licenses should share their thoughts on the auction rules by August 24, 2026, with replies due by September 8. This auction could shake up wireless tech and investment, so get ready to bid and innovate!