FAA shields planes from crew hacking via internal networks?!
Published Date: 8/7/2026
Rule
Summary
The FAA is setting new safety rules for ATR42-500 and ATR72-212A airplanes because they have a cool new digital system that lets people inside the plane access its electronics through wireless and wired networks. These rules make sure this tech is just as safe as older systems. The changes kick in on August 7, 2026, and anyone can share their thoughts by September 21, 2026—no extra costs expected.
Analyzed Economic Effects
2 provisions identified: 1 benefits, 1 costs, 0 mixed.
Cybersecurity Requirements for ATR42/ATR72
The FAA requires new cybersecurity protections for ATR Model ATR42-500 and ATR72-212A airplanes effective August 7, 2026. The design must prevent unauthorized internal access and stop inadvertent or malicious changes to systems required for safe flight, protecting the confidentiality, integrity, and availability of airplane electronic systems.
Operator and Applicant Security Procedure Duties
ATR (the applicant) must design isolation or electronic-system security protections and establish procedures so operators can maintain those safeguards, including for post-type-certification modifications. This requirement is effective August 7, 2026, with comments due September 21, 2026; the FAA states no extra costs are expected.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2026-19255, Airworthiness Directives; The Boeing Company Airplanes
The FAA wants to make sure certain Boeing 737-8, 737-9, and 737-8200 planes are super safe by checking if some elevator parts were put together right. They’re asking for inspections to spot cracks or missing sealant on bearings and fixing any problems found. Plane owners need to act soon, with comments due by November 5, 2026, and this could mean some inspection costs but keeps flights safe and sound.
2026-19149, Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
The FAA is updating flight rules for certain airports to keep flying safe and smooth. They’re changing how pilots approach, take off, and avoid obstacles based on new tech and airspace changes. These updates kick in on September 18, 2026, and affect pilots and airports, but won’t cost anyone extra.
Previous / Next Documents
Previous: 2026-16123, 2-Propenoic Acid, 2-Methyl-, Telomer With 1-Dodecanethiol, and 2-Methyloxirane Polymer With Oxirane Monoether With 1,2-Propanediol Mono(2-Methyl-2-Propenoate) in Pesticide Formulations; Exemption From the Requirement for a Tolerance
This regulation establishes an exemption from the requirement of a tolerance for residues of 2-propenoic acid, 2-methyl-, telomer with 1-dodecanethiol, and 2-methyloxirane polymer with oxirane monoether with 1,2-propanediol mono(2-methyl-2-propenoate) (CAS Reg. No 1186225-21-7) when used as an inert ingredient in a pesticide chemical formulation. Spring Regulatory Sciences on behalf of Clariant Corporation submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting an exemption from the requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of 2-propenoic acid, 2-methyl-, telomer with 1-dodecanethiol, and 2-methyloxirane polymer with oxirane monoether with 1,2-propanediol mono(2-methyl-2-propenoate) on food or feed commodities when used in accordance with these exemptions.
Next: 2026-16133, Auction of FM Broadcasting Construction Permits Scheduled for February 2, 2027; Notice and Filing Requirements, Minimum Opening Bids, Upfront Payments, and Other Procedures for Auction 114
This document summarizes the procedures, deadlines, and upfront payment and minimum opening bid amounts for the upcoming auction of FM broadcast construction permits. The Auction 114 Procedures Public Notice summarized here provides details regarding the procedures, terms, conditions, dates, and deadlines governing participation in Auction 114 bidding, as well as overview of the post- auction application and payment processes.