Airbus Planes Get Stricter Maintenance Rules from FAA
Published Date: 9/17/2026
Proposed Rule
Summary
The FAA proposes to adopt a new airworthiness directive (AD) for all Airbus SAS Model A300 B4-600, B4-600R, and F4-600R series airplanes; and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes). This proposed AD was prompted by a determination that new or more restrictive airworthiness limitations are necessary. This proposed AD would require revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations. The FAA is proposing this AD to address the unsafe condition on these products.
Analyzed Economic Effects
3 provisions identified: 1 benefits, 2 costs, 0 mixed.
Estimated Per-Operator Compliance Cost
The FAA estimates revising the maintenance or inspection program takes 90 work-hours per operator at $85 per hour, for an average cost of $7,650 per operator. The FAA estimates this proposed AD would affect 120 U.S.-registered airplanes.
Maintenance Program Revisions Required
If you operate Airbus A300-600 series airplanes, you must revise your existing maintenance or inspection program to incorporate the new or more restrictive airworthiness limitations specified in EASA AD 2025-0255. The FAA requires this revision within 90 days after the effective date of this AD and compliance with the actions and times specified in that EASA AD.
Terminates Certain Prior AD Requirements
Completing the actions required by this AD terminates the corresponding requirements of FAA AD 2024-16-02 for the tasks identified in the material referenced in EASA AD 2025-0255. The termination applies only to those specific tasks identified in the incorporated material.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2026-19082, Airworthiness Directives; The Boeing Company Airplanes
The FAA is adopting a new airworthiness directive (AD) for certain The Boeing Company Model 737-8, 737-9, and 737-8200 airplanes. This AD was prompted by reports indicating cracks in the bear strap and stub frame at the forward galley door cutout. This AD requires inspections for existing repairs; an inspection for any crack of the fuselage skin, bear strap, and stub frame; repetitive inspections for any crack of the bear strap and stub frame; and applicable on-condition actions. The FAA is issuing this AD to address the unsafe condition on these products.
2026-19083, Airworthiness Directives; The Boeing Company Airplanes
The FAA is adopting a new airworthiness directive (AD) for certain The Boeing Company Model 767-300F series airplanes. This AD was prompted by a report of a supplier notice of escapement documenting that some titanium cargo track crown fittings had suspect material certifications. This AD requires an X-ray fluorescence (XRF) spectrometer inspection to identify the material composition of the cargo track crown fittings or replacement of all cargo track crown fittings with new cargo track crown fittings, and applicable on- condition actions. The FAA is issuing this AD to address the unsafe condition on these products.
Previous / Next Documents
Previous: 2026-19089, Airworthiness Directives; ATR-GIE Avions de Transport Régional Airplanes
The FAA proposes to adopt a new airworthiness directive (AD) for all ATR-GIE Avions de Transport R[eacute]gional Model ATR42 and ATR72 airplanes. This proposed AD was prompted by reports of uncommanded nose landing gear (NLG) retraction. This proposed AD would require a leakage test of certain landing gear selector valves (LGSVs) and replacement, as applicable. This proposed AD would also limit the installation of affected parts under certain conditions. The FAA is proposing this AD to address the unsafe condition on these products.
Next: 2026-19094, Airworthiness Directives; Pratt & Whitney Engines
The FAA proposes to adopt a new airworthiness directive (AD) for all Pratt & Whitney (PW) Model PW1519G, PW1521G, PW1521GA, PW1521G- 3, PW1524G, PW1524G-3, PW1525G, PW1525G-3, PW1919G, PW1919G-RC, PW1921G, PW1921G-RC, PW1922G, PW1923G, and PW1923G-A engines with a certain high-pressure compressor (HPC) module installed. This proposed AD was prompted by six reports of clashing found on either the HPC 2nd stage rotor or 3rd stage rotor caused by contact with the corresponding HPC variable stator vanes (VSV). This proposed AD would require initial and repetitive borescope inspections (BSIs) of the HPC 1st stage, 2nd stage, and 3rd stage rotor rear rim surfaces for evidence of wear, scratching, or contact with the corresponding HPC VSV inner locating ring and, depending on the results, removal from service and replacement. This proposed AD would also require replacement of the HPC VSV bushing set as terminating action to the initial and repetitive BSIs of the HPC 1st stage, 2nd stage, and 3rd stage rotor rear rim surfaces. The FAA is proposing this AD to address the unsafe condition on these products.