The FAA is requiring all Rolls-Royce Deutschland RB211 Trent 768-60, 772-60, and 772B-60 engines to have certain low-pressure compressor blades removed and replaced because they were repaired incorrectly and might crack. This rule kicks in on November 17, 2026, to keep flights safe. If you own or operate these engines, expect some maintenance work soon to avoid any safety risks.
Analyzed Economic Effects
3 provisions identified: 1 benefits, 2 costs, 0 mixed.
Mandatory LPC blade removal and replacement
If you own or operate Rolls-Royce Deutschland RB211 Trent 768-60, 772-60, or 772B-60 engines, you must remove affected low-pressure compressor (LPC) blades and replace them with serviceable parts in accordance with EASA AD 2025-0288R1. This AD is effective November 17, 2026, and requires compliance within the times specified in that EASA AD.
Estimated compliance cost per engine and for U.S. fleet
The FAA estimates the replacement will take 2 work-hours at $85 per hour plus parts costing $225,000, for a total estimated cost of $225,170 per engine. The FAA estimates this AD affects eight engines on U.S.-registered airplanes for a combined cost to U.S. operators of $1,801,360.
Reduces risk of in-flight engine failures
The AD requires replacing non-conforming LPC blades because they are prone to cracking; if not fixed, that cracking could lead to in-flight shutdown, engine fire, or release of high-energy debris. The FAA issued the AD to address that unsafe condition and improve flight safety.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
2025-03853, Enforcement Policy Regarding “Drug and Alcohol Testing of Certificated Repair Station Employees Located Outside of the United States; Correction”
The FAA is giving repair stations outside the U.S. a break by delaying enforcement of new drug and alcohol testing rules until March 20, 2025. This means affected repair stations don’t have to worry about penalties if they aren’t fully following the updated rules just yet. The delay helps everyone get ready without rushing or extra costs.
Previous / Next Documents
Previous: 2026-20861, Fisheries of the Northeastern United States; Summer Flounder Fishery; 2026 Commercial Quota Harvested for the State of Maine
The 2026 summer flounder commercial fishing quota for Maine has been fully caught, so commercial fishing boats can’t land summer flounder there for the rest of the year unless more quota is shared from another state. This temporary closure starts October 13, 2026, and lasts until December 31, 2026. Fishermen and dealers in Maine need to follow this rule to keep the fishery healthy and fair.
Next: 2026-20870, Fisheries of the Exclusive Economic Zone off Alaska; Reallocation of Pacific Cod in the Western Regulatory Area of the Gulf of Alaska
Starting October 13, 2026, some Pacific cod that wasn’t caught by trawl fishing boats in the Western Gulf of Alaska will be shared with boats using hook-and-line and pot gear. This switch helps make sure the total allowed catch for 2026 is fully used, benefiting fishermen with different gear types. The change lasts until the end of 2026 and aims to keep the fishing fair and efficient without extra costs.