The FAA wants to update safety rules for certain Pratt & Whitney RTX engines to fix a missed part number and clarify inspection steps. If you own or operate these engines, you’ll need to keep checking key parts for cracks and replace them if needed to keep flying safe. Comments on this update are open until December 3, 2026, so get involved before then!
Analyzed Economic Effects
4 provisions identified: 1 benefits, 3 costs, 0 mixed.
Required repetitive inspections of key parts
If you own or operate the listed Pratt & Whitney RTX PW4074/PW4077/PW4084D/PW4090-series engines, the FAA proposes repetitive angle ultrasonic scan inspections (AUSIs) of the HPC 15th-stage disks, front turbine hubs, HPT 1st-stage air seals, and HPT 2nd-stage hubs for crack indications. The FAA estimates this proposed AD would affect 124 engines on U.S. registry; the agency lists inspection labor costs of $340 for the HPC 15th-stage disk inspection and $425 for each of the other part inspections, and gives total U.S. operator inspection cost estimates of $42,160 and $52,700 for those inspection types.
Mandatory replacement for specific air‑seal serial numbers
For HPT 1st-stage air seals with the serial numbers listed in Table 1 to paragraph (g)(1) of the AD, you must remove the HPT 1st-stage air seal at the next piece part opportunity and replace it with a part eligible for installation. The FAA estimates 6 engines will require replacement of these HPT 1st-stage air seals and provides a replacement cost per product of about $763,085 and a total U.S. operators cost of $4,578,510 for those six replacements.
Optional terminating action via ALS revision
You may avoid the repetitive AUSI requirements in paragraphs (g)(2) and (g)(3) by revising the Airworthiness Limitations Section (ALS) of the engine manual and your approved maintenance/inspection program to incorporate the information in figure 1 to paragraph (i) of this AD; doing so constitutes terminating action for those required inspections. The AD identifies this ALS revision as the optional terminating action.
Adds HPT 2nd‑stage hub P/N 53L402 to coverage
The proposed AD adds HPT 2nd-stage hub part number (P/N) 53L402 to the list of parts covered by the inspection requirements. If you have HPT 2nd-stage hubs with P/N 53L402, those parts are now explicitly subject to the AUSI and replacement requirements in this proposed AD.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
2025-03853, Enforcement Policy Regarding “Drug and Alcohol Testing of Certificated Repair Station Employees Located Outside of the United States; Correction”
The FAA is giving repair stations outside the U.S. a break by delaying enforcement of new drug and alcohol testing rules until March 20, 2025. This means affected repair stations don’t have to worry about penalties if they aren’t fully following the updated rules just yet. The delay helps everyone get ready without rushing or extra costs.
Previous / Next Documents
Previous: 2026-21289, Air Quality Plan; Arizona; Agricultural Best Management Practices Rules for the West Pinal County PM10 Nonattainment Area
The EPA is proposing new rules to help clean up dust pollution from farms and ranches in West Pinal County, Arizona. These rules will require farmers to use better practices to reduce tiny dust particles that harm air quality. If approved, these changes will kick in soon and help protect local health without big costs for farmers.
Next: 2026-21300, Gates of the Arctic National Park and Preserve; Use of Off-Road Vehicles for Subsistence Purposes by Residents of Anaktuvuk Pass
The National Park Service wants to set rules for off-road vehicle use by Anaktuvuk Pass residents in Gates of the Arctic National Park. They’ll step in only if vehicle use harms health, safety, wildlife, or subsistence activities. Comments on this plan are open until December 18, 2026, with no new fees or costs expected.