If you own or operate certain Boeing 747-400 and -8 airplanes, this new FAA rule means you’ll need to regularly check specific fuel pump parts for damage and fix any problems found. These inspections start December 7, 2026, to keep flights safe and avoid costly repairs later. The rule also restricts using certain parts unless they meet safety standards.

Analyzed Economic Effects

5 provisions identified: 1 benefits, 4 costs, 0 mixed.

Mandatory repetitive pump inspections

If you own or operate certain Boeing 747-400 and 747-8 airplanes identified in Boeing Alert Requirements Bulletin 747-28A2373 RB (dated November 6, 2025), you must begin repetitive inspections for damage to the transfer pump housing inlet check valves and transfer pump motor impeller inlet adapters for the horizontal stabilizer fuel tank starting December 7, 2026. You must follow the inspection times and on-condition actions specified in that Boeing Requirements Bulletin.

Parts installation restriction

As of December 7, 2026, you may not install a Crane Aerospace Hydro-Aire horizontal stabilizer fuel transfer pump housing, transfer pump housing inlet check valve, or transfer pump motor impeller into the horizontal stabilizer fuel tank unless the parts have been inspected per paragraph (g) of the AD and determined to be serviceable as defined in Boeing Alert Requirements Bulletin 747-28A2373 RB (dated November 6, 2025).

Estimated compliance and replacement costs

The FAA estimates this AD affects 31 U.S.-registered airplanes. The agency estimates each inspection action costs $1,530 (18 work-hours at $85/hour) and totals $47,430 across U.S. operators per inspection cycle for each inspection action. On-condition replacement costs are estimated up to $2,570 for a pump impeller replacement, $1,970 for an inlet check valve replacement (Option 1), and up to $20,170 for a transfer pump housing replacement (Option 2).

Special flight permits allowed with limits

Special flight permits may be issued to ferry an airplane to a location where the AD actions can be performed, but only if the horizontal stabilizer fuel tank is defueled and both transfer pump circuit breakers are locked in the "open" position as specified in the AD. These permits are issued under 14 CFR 21.197 and 21.199.

AD classified as interim action — possible future rulemaking

The FAA considers this AD an interim action and notes the main and center wing tanks use the same pump design but are not currently subject to this unsafe condition; the FAA may consider further rulemaking for those tanks if further analysis or reports change the assessment.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Published Date
Rule Effective
11/2/2026
12/7/2026

Department and Agencies

Department
Independent Agency
Agency
Transportation Department
Federal Aviation Administration
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register