2026-23372Proposed RuleWallet

FAA Tweaks TBM Landing Gear Checks, Retiring the Dye Test

Published Date: 11/17/2026

Proposed Rule

Summary

If you own or fly a Daher TBM 700 airplane, the FAA wants you to keep checking the main landing gear for cracks but with some new rules. They’re adding more approved parts and saying no more dye penetrant inspections. You’ve got until January 4, 2027, to share your thoughts, and these changes help keep flights safe without extra costs for replacing gear.

Analyzed Economic Effects

5 provisions identified: 1 benefits, 3 costs, 1 mixed.

Replace MLG to stop inspections (terminating action)

You may stop the repetitive inspections by installing a “serviceable part” (any MLG forging body that is not an affected part) on both left and right MLGs in accordance with the listed service bulletins; replacement is a terminating action for the inspection requirement. The FAA estimates replacement cost at 4 work-hours × $85/hr = $340 plus $6,000 parts, totaling $6,340 per replacement.

Mandatory MLG inspections every 240 landings

If you operate a Daher TBM 700 with an “affected part” (MLG forging body P/N 21236-000-00, 21236-000-01, 22609-000-00, 22609-001-00, 22611-000-00, 22611-001-00, D67685, or D67686) and your airplane serial number is 1–638 or 687, you must do a special detailed inspection of the main landing gear forging body within the stated compliance times and then at intervals not to exceed 240 landings. The FAA estimates 431 U.S.-registered airplanes are affected and estimates the inspection cost at 4 work-hours × $85/hr = $340 per inspection (totaling $146,540 across U.S. operators per inspection).

On-condition and confirmation inspection costs

If a crack is suspected during the SDI, you must remove the MLG leg and confirm the crack with a fluorescent penetrant inspection (estimated 8 work-hours × $85/hr = $680). If replacement is chosen as the corrective action, the AD estimates parts + labor cost at $6,340 per replacement.

Dye penetrant inspection removed

The rule explicitly removes dye penetrant as an authorized method for the repetitive special detailed inspection; the SDI must be done by eddy current or fluorescent penetrant per the service bulletin and MCAI.

Credit for prior inspections under listed bulletins

If you already performed the required actions before this AD's effective date using the listed Daher service bulletins (Revisions 2, 3, 4, or Revision 4/Revision 3 etc. as specified), you receive credit toward the AD requirements, so you do not need to repeat those actions to comply.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Published Date
Comments Due
11/17/2026
1/4/2027

Department and Agencies

Department
Independent Agency
Agency
Transportation Department
Federal Aviation Administration
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register