FAA Says Goodbye to Checks for Aircraft and Pilot Services
Published Date: 11/17/2026
Proposed Rule
Summary
The FAA is updating how it takes payments by saying goodbye to paper checks, cash, and money orders, and hello to electronic payments only. This change affects anyone paying for things like aircraft registration, pilot certificates, or FAA services, making payments faster and safer. Get ready to switch by early 2027, as paper payments will no longer be accepted!
Analyzed Economic Effects
5 provisions identified: 0 benefits, 5 costs, 0 mixed.
FAA moves all payments to electronic-only
FAA proposes to stop accepting paper payments (cash, paper checks, and money orders) and require electronic payments for fees and penalties listed in 14 CFR parts 13, 47, 49, 61, 63, 65, 187, and 406. The rule would require electronic payments unless another payment method is otherwise authorized by law and FAA already directs customers to Pay.gov for many of these payments.
Civil penalty payments must be electronic
Payments of FAA civil penalties (including those covered in part 13 and part 406 procedures) would have to be made by electronic payment instead of certified checks, money orders, or paper checks, unless another payment method is otherwise authorized by law. The rule text would change §§ 13.15, 13.16, 13.18 and §406.9 to require electronic payment.
Aircraft registration and title recording payments go electronic
Fees for aircraft registration (§47.17) and for recording aircraft titles and security documents (§49.15) would be required to be paid by electronic payment rather than by check or money order, unless another payment method is otherwise authorized by law. FAA currently accepts these payments via the CARES portal and Pay.gov and would codify electronic payments in the CFR.
Replacement certificates and test reports must be paid electronically
Fees for replacement airman certificates, medical certificates, and knowledge test reports (covered in §§ 61.29, 63.16, and 65.16) would have to be paid by electronic payment rather than by check or money order, unless another payment method is otherwise authorized by law. For example, §65.16 currently directs a $2 fee made by check or money order for some replacement certificates; that payment would be required electronically under the proposal.
Overflight and overseas service fees move to electronic payments
Overflight fees and fees for FAA services performed outside the United States (part 187) would be required to be paid by electronic payment rather than by check or money order, unless another payment method is otherwise authorized by law. Currently, overflight payments greater than $1,000 must be made by electronic funds transfer (EFT) and payments under $1,000 may be paid by EFT, check, money order, credit card, or draft; the proposal would eliminate check and money order options.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-15585, Requirements for Interference-Tolerant Radio Altimeter Systems
In July 2025, President Trump signed the One Big Beautiful Bill Act. Section 40002 of that law re-institutes the Federal Communications Commission's general auction authority and specifically directs the Commission to complete a system of competitive bidding for not less than 100 megahertz in the 3.98-4.2 gigahertz band (Upper C- band). This final rule supports the Federal Communications Commission's July 2026 Report and Order that makes 160 megahertz of the Upper C-band available for terrestrial wireless flexible use via a system of competitive bidding. To ensure safe, efficient, and reliable aviation operations in the presence of wireless signals in the C-band, the Federal Aviation Administration is issuing new regulations that require all radio altimeters to meet specific minimum performance requirements. These new radio altimeters must withstand interference from wireless signals in neighboring spectrum bands and continue to provide accurate altitude readings to both pilots and integrated aircraft safety systems. These regulations require all aircraft equipped with radio altimeters operating under part 121 and those aircraft with radio altimeters operating under part 129 with 30 or more passenger seats or a payload capacity of more than 7,500 pounds to comply with the minimum performance requirements by December 30, 2030, which is prior to the date the Federal Communications Commission authorizes the use of the Upper C-band for new wireless services, as stated in its Report and Order. All other aircraft equipped with radio altimeters that are required to comply with part 91, including aircraft operating under parts 125, 133, 135, 136, 137, 194, and all other aircraft operating under part 129 that are not subject to the initial deadline, must comply with the same minimum performance requirements on or before October 31, 2034.
2026-13440, Enabling Supersonic Overland Flight
The FAA wants to let supersonic planes fly over land again by updating old rules that banned them because of loud sonic booms. Thanks to new tech that keeps booms quiet, this change will open the door for faster, cooler flights across the U.S., helping America lead the world in supersonic travel. People and companies interested in supersonic flight should share their thoughts by August 17, 2026.
2026-13126, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility; Extension of Comment Period
The FAA is giving more time—until August 5, 2026—for people to share their thoughts on new rules that would limit drone flights near important fixed sites like power plants or airports. This affects drone operators and facility owners who want to keep the skies safe and secure. No new costs yet, just extra time to weigh in and help shape the rules.
2026-08943, Designation-Restrict the Operation of Unmanned Aircraft in Close Proximity to a Fixed Site Facility
The FAA is proposing new rules to keep drones away from certain important fixed sites like power plants or airports to keep everyone safe and secure. If you own or operate one of these sites, you can request a drone flight restriction zone to protect your property and people nearby. Comments are open until July 6, 2026, and these changes could affect drone pilots and site operators, but no big costs are expected.
2025-04846, Extension of the Prohibition Against Certain Flights in the Territory and Airspace of Libya
The FAA is extending the ban on certain flights over Libya for three more years, until March 20, 2028. This affects U.S. airlines, commercial operators, and pilots with FAA certificates flying in Libyan airspace, due to ongoing safety risks. The rule also reminds everyone how to apply for special approvals or exemptions if needed.
2025-03853, Enforcement Policy Regarding “Drug and Alcohol Testing of Certificated Repair Station Employees Located Outside of the United States; Correction”
The FAA is giving repair stations outside the U.S. a break by delaying enforcement of new drug and alcohol testing rules until March 20, 2025. This means affected repair stations don’t have to worry about penalties if they aren’t fully following the updated rules just yet. The delay helps everyone get ready without rushing or extra costs.
Previous / Next Documents
Previous: 2026-23390, Respirable Crystalline Silica and Respiratory Protection
This update fixes a small mistake in the rules about protecting miners from harmful silica dust. It affects underground and surface coal mine operators by clarifying exposure limits to dangerous dust and gases. The correction takes effect November 17, 2026, helping keep miners safer without adding big costs.
Next: 2026-23398, Release of Waybill Data
The Surface Transportation Board got a request from Civil Design Inc. for special access to detailed railroad shipment data about soybeans, corn, and wheat from 2020 to 2024 in certain counties. If anyone disagrees, they have 14 days to speak up. This could impact farmers, shippers, and railroads by making some shipment info more available soon.